Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
06/04/2020
Applicant:
Gregory Moore
Description:
NEW MULTI FAMILY

Permit Reviews

Permit Number - T20CM03401
Permit Status: Complete
Permit Description: NEW MULTI FAMILY
Start Date Submittal Complete Date Status  
01/14/2021 RESUBMITTAL 01/20/2021 ACTIVE Review Details
06/04/2020 PLANS OK TO SUBMIT - COMM 08/05/2020 COMPLETED Review Details
08/05/2020 COMMERCIAL - NEW 11/13/2020 COMPLETED Review Details
11/06/2020 RESUBMITTAL 12/14/2020 COMPLETED Review Details
11/13/2020 RESUBMITTAL 12/08/2020 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T20CM03401
Permit Status: Complete
Permit Description: NEW MULTI FAMILY
Total Outstanding Activity Conditions - 1
Date Name
06/08/2023 WATER STERILIZATION REPORT IS REQUIRED.

Conditions

Permit Number - T20CM03401
Permit Status: Complete
Permit Description: NEW MULTI FAMILY
Date Description Comments
06/04/2020 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Outstanding Inspections

Permit Status: Complete
Permit Number: T20CM03401
Permite Description: NEW MULTI FAMILY
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCEL - Electrical Progress N/A Not Ready
12/28/2022 COT - HCBU - Exterior Clips/Sheathing N/A Partial Pass Inspection is for masonry grout for club house at 0’ - 4’. Ok to place grout in progress areas.
02/27/2023 COT - LCEL - Construction Power N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready
01/04/2023 COT - LCPL - Plumbing Progress N/A Canceled
10/26/2022 COT - FCON - Fire - Final N/A Not Ready
07/19/2023 COT - LCBU - Building Final N/A Partial Pass recommend level 3 TCO
09/15/2023 ENGR Engineering Final N/A Partial Pass This site has been Inspected to see what items will need to be addressed before the Development Package can be Approved and placed into Final Status. The Following items have been noted as needing to be addressed prior to this site being allowed to be Closed. A re-inspection of the site will be required once all comments have been addressed.

A) Complete the landscaping as shown on the approved plans and provide revised drawings for all changes that have been made to the site since the plans were original approved.

B) Complete the grading of all the landscape areas in, around, or adjacent to this site as shown on the approved plans, and ensure that all plant material has been installed accordingly.

C) Complete all of the drainage as shown on the Approved plans to ensure that all roof drainage is directed from the down drains into the scuppers out onto the adjacent parking areas.
09/18/2023 COT - BULD - SWG Clearance N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: T20CM03401
Permit Description: NEW MULTI FAMILY
Total Completed Inspections - 36
Date Description Inspector Results Comments
05/03/2022 COT - LCPL - Rough Soil Passed {Activity date: 05/03/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved for Building #4 (units 4101-4110)}
05/03/2022 COT - LCPL - Sewer Passed {Activity date: 05/03/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved for Building #4 (units 4101-4110)}
05/03/2022 COT - LCPL - Backwater Valve Passed {Activity date: 05/03/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved for Building #4 (units 4101-4110)}
05/11/2022 COT - LCBU - Building Progress Passed {Activity date: 05/11/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - AP. Top out of eight foot site wall sections.} ; {Activity date: 04/29/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial for remaining 1st lift of the perimeter wall continuing at the north and west property lines (west of building 1 and 2), okay to grout progress areas} ; {Activity date: 04/26/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - - Partial for 1st lift of the perimeter wall at the north property line (behind building 4)} ; {Activity date: 03/31/2022; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - NR} ; {Activity date: 10/25/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, construction meeting no inspection required.}
05/31/2022 COT - LCEL - Electrical Underground Passed {Activity date: 05/31/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved}
05/31/2022 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 05/31/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} ; {Activity date: 03/31/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial approval for foundations of the site walls (8’ high) at the North and West property lines, okay to pour progress areas}
05/31/2022 COT - LCBU - Preslab Passed {Activity date: 05/31/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved}
[approved on preslab, rebar, and electric underground for club house/laundry room/well room] Carrazco 11-08-22
05/31/2022 COT - LCEL - Grounding/Bonding Passed {Activity date: 05/31/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved}
08/25/2022 COT - LCBU - Exterior Clips/Sheathing Passed {Activity date: 08/25/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Ok to cover exterior walls.
} ; {Activity date: 08/24/2022; Status: Cancelled; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - ) cancel per Tom. Contractor}
08/25/2022 COT - LCBU - Roof Nailing Passed {Activity date: 08/25/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Ok to dry in roof system.} ; {Activity date: 08/24/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - not ready. Need access to roof.}
11/09/2022 COT - LCPL - Yard Water Line Passed
12/15/2022 COT - LCPL - Plumbing Above Ceiling Passed
12/15/2022 COT - LCBU - Framing Passed
12/15/2022 COT - LCME - Mechanical Intermediate Passed
12/15/2022 COT - LCBU - Building Above Ceiling Passed
12/15/2022 COT - LCBU - Firewall/Fire Barrier/Firestop Passed
12/15/2022 COT - LCEL - Electrical Above Ceiling Passed
12/15/2022 COT - LCME - Mechanical Above Ceiling Passed
12/15/2022 COT - HCBU - Interior Shear Bracing Passed
12/15/2022 COT - LCPL - Plumbing Intermediate Passed
01/10/2023 COT - HCBU - Masonry Pregrout Passed
02/08/2023 COT - HCBU - Exterior Clips/Sheathing Passed for club house only
02/08/2023 COT - HCBU - Roof Nailing Passed for clubhouse only
03/06/2023 COT - LCEL - Construction Power Passed ECO Clearance to TEP for construction power at Bldg 4 (units #4101, 4102, 4103, 4104, 4105, 4106, 4107, 4108, 4109, 4110)
07/19/2023 COT - LCPL - Plumbing Final Passed
07/19/2023 COT - LCPL - Plumbing Progress Passed
07/19/2023 COT - LCBU - Sustainability Passed
07/19/2023 COT - LCEL - Electrical Final Passed
07/19/2023 COT - LCME - Mechanical Final Passed
07/19/2023 COT - LCEL - Electrical Intermediate Passed
07/19/2023 COT - LCEL - Outdoor Lighting Passed
07/19/2023 COT - FCON - Fire - Final Passed
07/19/2023 COT - LCME - Mechanical Progress Passed
09/15/2023 COT - LCBU - Building Final Passed
09/18/2023 COT - LCBU - CofO Passed 9/18/23: CofO
09/18/2023 BULD - Electrical Clearance Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
GEOTECH.PDF DOCUMENTS VIEW
SPECIAL INSPECTION CERT.PDF DOCUMENTS VIEW
PETITION OF APPEAL.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
WAIVER AUTH.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW