Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Expired
Type:
Commercial Building
Address NEW:
2645 E SPEEDWAY BL
Apply Date:
05/26/2020
Applicant:
Lisa Bowers
Description:
TI: Transit Tea restaurant.

Permit Reviews

Permit Number - T20CM03183
Permit Status: Expired
Permit Description: TI: Transit Tea restaurant.
Start Date Submittal Complete Date Status  
05/26/2020 COMMERCIAL - TI 06/11/2020 COMPLETED Review Details
06/11/2020 RESUBMITTAL 06/24/2020 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T20CM03183
Permit Status: Expired
Permit Description: TI: Transit Tea restaurant.
Total Outstanding Activity Conditions - 4
Date Name
05/26/2020 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
05/27/2020 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
05/27/2020 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/27/2020 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.

Outstanding Inspections

Permit Status: Expired
Permit Number: T20CM03183
Permite Description: TI: Transit Tea restaurant.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
11/04/2022 COT - LCPL - Gas Pressure Test N/A Canceled Inspection Canceled
11/04/2022 COT - LCME - Mechanical Above Ceiling N/A Canceled Inspection Canceled
11/04/2022 COT - ENGR - Site - Assurance Release N/A Canceled Inspection Canceled
11/04/2022 COT - LCPL - Sewer N/A Canceled Inspection Canceled

Completed Inspections

Permit Status: Expired
Permit Number: T20CM03183
Permit Description: TI: Transit Tea restaurant.
Total Completed Inspections - 14
Date Description Inspector Results Comments
12/22/2020 PDSD Building Division - TEP PM Clearance Passed {Activity date: 12/22/2020; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VLEON1 - CODE INCR}
12/22/2020 COT - LCEL - Construction Power Passed {Activity date: 12/22/2020; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Approved. The TEP clearance code is INCR.
}
03/01/2021 COT - LCEL - Electrical Intermediate Passed {Activity date: 03/01/2021; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - WALLS WERE CLOSED WITHOUT COT INSPECTION. APPROVALS OF ALL INTERMEDIATE INSPECTIONS IS BASED ON LETTERS PROVIDED BY SUBCONTRACTORS AS WELL AS THE SPECIAL INSPECTOR REPORT.}
03/01/2021 COT - LCBU - Framing Passed {Activity date: 03/01/2021; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - WALLS WERE CLOSED WITHOUT COT INSPECTION. APPROVALS OF ALL INTERMEDIATE INSPECTIONS IS BASED ON LETTERS PROVIDED BY SUBCONTRACTORS AS WELL AS THE SPECIAL INSPECTOR REPORT.}
03/01/2021 COT - LCPL - Plumbing Intermediate Passed {Activity date: 03/01/2021; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - WALLS WERE CLOSED WITHOUT COT INSPECTION. APPROVALS OF ALL INTERMEDIATE INSPECTIONS IS BASED ON LETTERS PROVIDED BY SUBCONTRACTORS AS WELL AS THE SPECIAL INSPECTOR REPORT.} ; {Activity date: 12/22/2020; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by VLEON1 - }
03/01/2021 COT - LCPL - Plumbing Above Ceiling Passed {Activity date: 03/01/2021; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - } ; {Activity date: 12/22/2020; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by VLEON1 - }
03/01/2021 COT - LCME - Mechanical Intermediate Passed {Activity date: 03/01/2021; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - WALLS WERE CLOSED WITHOUT INSPECTION. APPROVED BASED ON LETTERS PROVIDED BY ALL SUBCONTRACTORS CERTIFYING THEIR WORK.}
04/14/2021 COT - LCBU - Building Final Passed {Activity date: 04/14/2021; Status: Approved; Inspector: RELEFANTE; Comment: Entered by VLEON1 - }
04/14/2021 COT - LCME - Mechanical Final Passed {Activity date: 04/14/2021; Status: Approved; Inspector: RELEFANTE; Comment: Entered by VLEON1 - } ; {Activity date: 06/15/2020; Status: Prior to Final Inspectn; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - AIR BALANCE REPORT REQUIRED}
04/14/2021 COT - LCEL - Electrical Final Passed {Activity date: 04/14/2021; Status: Approved; Inspector: RELEFANTE; Comment: Entered by VLEON1 - }
04/14/2021 ENGR Engineering Final Passed {Activity date: 04/14/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VLEON1 - }
04/14/2021 COT - LCBU - CofO Passed {Activity date: 04/14/2021; Status: Approved; Inspector: RELEFANTE; Comment: Entered by VLEON1 - }
04/14/2021 COT - LCPL - Plumbing Final Passed {Activity date: 04/14/2021; Status: Approved; Inspector: RELEFANTE; Comment: Entered by VLEON1 - } ; {Activity date: 06/15/2020; Status: Prior to Final Inspectn; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - WATER DISINFECTION REPORT REQUIRED}
05/11/2021 COT - FCON - Fire - Final Passed {Activity date: 05/11/2021; Status: Approved; Inspector: jfordney; Comment: Entered by JFORDNE1 - } ; {Activity date: 04/14/2021; Status: Partial Approval; Inspector: wmotto1; Comment: Entered by WMOTTO1 - 1. Address must be durable material fixed to the building.
2. Need Signage above doors stating doors remain unlocked during buisness hours.
3. Add one fire extinguisher.}

Documents

File Name Document Type  
GCL (ELECTRICAL) 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GCL (PLUMBING) 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GCL 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
TUCSON CONCRETE 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GCL (ELECTRICAL).PDF DOCUMENTS VIEW
GCL (PLUMBING).PDF DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW
TUCSON CONCRETE.PDF DOCUMENTS VIEW
1_APPLICATION.PDF DOCUMENTS VIEW
1_STRUCTURAL_CALCS.PDF DOCUMENTS VIEW
2_PLAN_SET.PDF CONSTRPLANS VIEW
PERMIT.PDF CONSTRPLANS VIEW
SPECIAL INSPECTION CERTIFICATE TRANSIT.PDF CONSTRPLANS VIEW