Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Address:
501 W 18TH ST
Apply Date:
02/07/2020
Applicant:
ALCALA, ROBERT ANDREW
Description:
E - UPGRADE ELECTRICAL SERVICE

Permit Reviews

Permit Number - T20CM00919
Permit Status: Final
Permit Description: E - UPGRADE ELECTRICAL SERVICE
Start Date Submittal Complete Date Status  
02/07/2020 COMMERCIAL - BLDG/FIRE/ZONING/ENG 04/29/2020 COMPLETED Review Details
04/29/2020 RESUBMITTAL 06/25/2020 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T20CM00919
Permit Status: Final
Permit Description: E - UPGRADE ELECTRICAL SERVICE
Total Outstanding Activity Conditions - 1
Date Name
02/07/2020 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T20CM00919
Permit Description: E - UPGRADE ELECTRICAL SERVICE
Total Completed Inspections - 14
Date Description Inspector Results Comments
07/13/2021 ELECTRIC - UNDERGROUND JBURGE Approved Partial. South. Stub-up conduits at Building #1 area: 3” conduits (4); 2 1/2” conduits (2). Electric Room conduits: 4” (10); 3” (11); 2 1/2” (3); 1” (6).
Ok to cover progress areas.
12/03/2021 ELECTRIC - INTERMEDIATE JBURGE Approved Partial: Equipment and service cabinets: Building #10 Disconnect; Building #12 Disconnect; Parking lot SES; Building #11 SA and DC cabinets. South side: Building #3 SES: Building #4 Disconnect; Building #4 panels A, B. C; Building #1 Disconnect.

No Electric Clearances required at this time.
01/10/2022 TEP CLEARANCE - AM JBURGE Approved CODE INCR
01/10/2022 TEP CLEARANCE - AM JBURGE Approved CODE ECO
01/25/2022 TEP CLEARANCE - PM JBURGE Approved CODE INCR
02/28/2022 ELECTRIC - UFER JBURGE Approved Approved

Please close out this permit. No clearance required, all panels are energized.
02/28/2022 ELECTRIC - ABOVE CEILING JBURGE Approved Approved

Please close out this permit. No clearance required, all panels are energized.
02/28/2022 ELECTRIC - CONSTRUCTION POWER JBURGE Approved Approved

Please close out this permit. No clearance required, all panels are energized.
02/28/2022 ELECTRIC - TEMPORARY SERVICE JBURGE Approved Approved

Please close out this permit. No clearance required, all panels are energized.
02/28/2022 ELECTRIC - SERVICE UPGRADE JBURGE Approved Approved

Please close out this permit. No clearance required, all panels are energized.
02/28/2022 ELECTRIC - PROGRESS JBURGE Approved Approved

Please close out this permit. No clearance required, all panels are energized.
02/28/2022 ELECTRIC - OUTDOOR LIGHTING JBURGE Approved Approved

Please close out this permit. No clearance required, all panels are energized.
02/28/2022 ELECTRIC - FINAL JBURGE Approved Approved

Please close out this permit. No clearance required, all panels are energized.
02/28/2022 OUTDOOR LIGHTING FINAL JBURGE Approved Approved

Please close out this permit. No clearance required, all panels are energized.

Documents

File Name Document Type  
PERMIT.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
SPECIFICATIONS.PDF DOCUMENTS VIEW
CONSTRUCTION DOCUMENTS.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW