Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - UNDERGROUND
Permit Number - T20CM00919
Inspection Description - ELECTRIC - UNDERGROUND
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/28/2022 | ELECTRIC - UNDERGROUND | Approved | Approved Please close out this permit. No clearance required, all panels are energized. |
|
07/13/2021 | ELECTRIC - UNDERGROUND | Partial Approval | Partial. South. Stub-up conduits at Building #1 area: 3” conduits (4); 2 1/2” conduits (2). Electric Room conduits: 4” (10); 3” (11); 2 1/2” (3); 1” (6). Ok to cover progress areas. |
|
06/21/2021 | ELECTRIC - UNDERGROUND | Partial Approval | Partial. Conduits in trenches (2”-2 1/2”) for distribution from Buildings #1; 2; 3; 4 to west parking lot. Ok to cover progress areas. | |
06/08/2021 | ELECTRIC - UNDERGROUND | Partial Approval | Partial. North side; electric trench approximately 1500 linear feet with conduits (1 1/2” - 4”). Ok to cover progress areas. | |
06/01/2021 | ELECTRIC - UNDERGROUND | Partial Approval | Partial. Information only; approximately 3,400 linear feet of trenching to be excavated. Will recall 3 June for conduit placement. |