Permit: T20CM00377
Permit Details
Apply Date:
01/16/2020
Applicant:
N/A
Description:
RETAIL
Contractors:
- SEAN FRCKRELL
Permit Reviews
Permit Number - T20CM00377
Permit Status: C of o
Permit Description: RETAIL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/16/2020 | PLANS OK TO SUBMIT - COMM | 01/27/2020 | COMPLETED |
| 02/11/2021 | RESUBMITTAL | 03/02/2021 | COMPLETED |
| 02/13/2020 | COMMERCIAL - NEW | 03/19/2020 | COMPLETED |
| 03/19/2020 | RESUBMITTAL | 02/25/2021 | COMPLETED |
| 11/09/2020 | RESUBMITTAL | 12/09/2020 | COMPLETED |
Completed Inspections
Permit Status: C of o
Permit Number: T20CM00377
Permit Description: RETAIL
Total Completed Inspections - 47
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/31/2021 | PLUMBING - PRE SLAB | RELEFANTE | Approved | |
| 04/13/2021 | ELECTRIC - UFER | TTREMBULAK | Approved | |
| 05/10/2021 | STEM WALL/RETAINING WALL | RELEFANTE | Approved | |
| 05/12/2021 | ELECTRIC - UNDERGROUND | RELEFANTE | Approved | |
| 05/12/2021 | EXCAVATION/LAYOUT REBAR & ZON | RELEFANTE | Approved | |
| 06/08/2021 | PLUMBING - PROGRESS | RCHANDLER | Approved | APPROVED ROUGH IN FOR TOILET 123 |
| 06/14/2021 | BUILDING - PROGRESS | RELEFANTE | Approved | PARTIAL EXTERIOR RIGID INSULATION |
| 06/15/2021 | EXT METAL CLIPS/EXT SHEATHING | RELEFANTE | Approved | PER CONTRACTOR LETTER |
| 07/08/2021 | ELECTRIC - INTERMEDIATE | RELEFANTE | Approved | AP |
| 07/08/2021 | PLUMBING - ABOVE CEILING | RELEFANTE | Approved | AP |
| 07/08/2021 | PLUMBING - ROOF DRAINS | RELEFANTE | Approved | AP |
| 07/22/2021 | PLUMBING - GAS PRESSURE TEST | TGAUSP | Approved | Approved, please send clearance to SWG |
| 10/01/2021 | ELECTRIC - SERVICE UPGRADE | DQUINN | Approved | Ap Clear incr for transformer CRMX |
| 10/14/2021 | TEP CLEARANCE - PM | ESTEVENS | Approved | CODE ECO |
| 10/14/2021 | ELECTRIC - CONSTRUCTION POWER | ESTEVENS | Approved | Approved. The TEP clearance code is ECO. |
| 11/01/2021 | PLUMBING - SEWER HCS CONNECT | ESTEVENS | Approved | Approved |
| 11/02/2021 | GAS CLEARANCE | ESTEVENS | Approved | CODE GAS |
| 11/02/2021 | PLUMBING - YARD WTR LINE/TEST | ESTEVENS | Approved | Approved. Southwest gas clearance is required . |
| 11/02/2021 | MECHANICAL - INTERMEDIATE | ESTEVENS | Approved | Approved. Southwest gas clearance is required . |
| 11/02/2021 | MECHANICAL - ABOVE CEILING | ESTEVENS | Approved | Approved. Southwest gas clearance is required . |
| 11/02/2021 | BUILDING ABOVE CEILING | ESTEVENS | Approved | Approved. Southwest gas clearance is required . |
| 11/02/2021 | ELECTRIC - ABOVE CEILING | ESTEVENS | Approved | Approved. Southwest gas clearance is required . |
| 11/02/2021 | ELECTRIC - PROGRESS | ESTEVENS | Approved | Approved. Southwest gas clearance is required . |
| 11/02/2021 | BUILDING PRE-SLAB | ESTEVENS | Approved | Approved. Southwest gas clearance is required . |
| 11/03/2021 | ELECTRIC - TEMPORARY SERVICE | ESTEVENS | Approved | N/A |
| 11/03/2021 | NPPO - FINAL | MHERNANDEZ | Approved | APPROVED |
| 11/04/2021 | MECHANICAL - PROGRESS | ESTEVENS | Approved | N/A |
| 11/10/2021 | PLUMBING - INTERMEDIATE | ESTEVENS | Approved | PER CONTRACTOR LETTER |
| 11/10/2021 | REINFORCED MASONRY PRE-GROUT | ESTEVENS | Approved | PER CONTRACTOR LETTER |
| 11/10/2021 | PLUMBING - ROUGH, SOIL | ESTEVENS | Approved | PER CONTRACTOR LETTER |
| 11/10/2021 | FRAMING | ESTEVENS | Approved | PER CONTRACTOR LETTER |
| 11/10/2021 | ROOF NAILING | ESTEVENS | Approved | PER CONTRACTOR LETTER |
| 11/10/2021 | PLUMBING - GAS PRESS TEST FNL | ESTEVENS | Approved | PER CONTRACTOR LETTER |
| 11/24/2021 | MECHANICAL - FINAL | ESTEVENS | Approved | Approved. |
| 11/29/2021 | FIRE SPKLR - FINAL | jfordney | Approved | Approved 11/18/2021 |
| 11/29/2021 | CERTIFICATE OF OCCUPANCY | WGALLAGHER | Approved | Not ready need to complete all special Conditions listed on permit Also fire inspections and engineering inspections |
| 11/29/2021 | FIRE - ALARM FINAL | jfordney | Approved | |
| 11/29/2021 | ENGINEERING - FINAL | MHERNANDEZ | Approved | PARTIAL THE FRONT SCUPPER NEED DG. AND THE WEST SIDE NEED THE LANDSCAPE TO BE COMPLETED .THE BACK BASIN NEED TO BE COMPLETED TOO WITH LANDSCAPE . |
| 11/30/2021 | SIGN - FINAL | MHERNANDEZ | Approved | APPROVED /THE ADDRESS FOR THE BUILDING. |
| 12/01/2021 | PLUMBING - BACK WATER VALVE | ESTEVENS | Approved | N/A |
| 12/01/2021 | ELECTRIC - OUTDOOR LIGHTING | ESTEVENS | Approved | Approved. |
| 12/01/2021 | PLUMBING - FINAL | ESTEVENS | Approved | Approved. |
| 12/01/2021 | BUILDING - FINAL | ESTEVENS | Approved | Partial. Pending other inspections. |
| 12/03/2021 | RIGHT OF WAY - FINAL | ROBERTSON | Approved | Items Needed: 2 Pole Bolt Covers re-fastened. Abandoned Water Meter above grade needs to be removed. Cages installed on Backflow Preventors. Type 2 Scupper not constructed per SD 205. Handrail missing. Rip Rap not placed at Type 2 Scupper per plan. Multiple areas behind curb need material placed to prevent drop-off adjacent to sidewalk. Concrete washout/chunks to be removed near Type 2 Scupper. Broken pull box collar behind curb. Cleanup of oil/diesel spill on 22nd St bike lane. Partial Approval for Temp CofO. See T21RW01462 |
| 12/22/2021 | ELECTRIC - FINAL | ESTEVENS | Approved | Approved |
| 12/22/2021 | FIRE - FINAL | jfordney | Approved | |
| 12/22/2021 | LANDSCAPE - FINAL | MHERNANDEZ | Approved | APPROVED |