Inspection History Details
Inspection Status: Approved
Inspection History: RIGHT OF WAY - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/19/2022 | RIGHT OF WAY - FINAL | Approved | HANDRAIL WAS APPROVED BY MARTIN HERNANDEZ ALL NECESSARY REPAIRS HAVE BEEN COMPLETED. |
|
| 12/03/2021 | RIGHT OF WAY - FINAL | Partial Approval | Items Needed: 2 Pole Bolt Covers re-fastened. Abandoned Water Meter above grade needs to be removed. Cages installed on Backflow Preventors. Type 2 Scupper not constructed per SD 205. Handrail missing. Rip Rap not placed at Type 2 Scupper per plan. Multiple areas behind curb need material placed to prevent drop-off adjacent to sidewalk. Concrete washout/chunks to be removed near Type 2 Scupper. Broken pull box collar behind curb. Cleanup of oil/diesel spill on 22nd St bike lane. Partial Approval for Temp CofO. See T21RW01462 |