Permit: T19RW05058
Permit Details
Apply Date:
09/10/2019
Applicant:
RELIANCE COMMERCIAL CONSTRUCTION
Description:
CLEARING AND GRUBBING ON SITE (FUTURE WORK WILL INCLUDE EXCAVATION, FOR DRIVEWAY ENTRANCES. 09/30/19 - ADDING ADDITIONAL TRAFFIC CONTROL 10/03/19 - PLAN CHANGE - ADDING 24HR CLOSURE 02/05/20 - OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP.
Contractors:
- MAGNUM PAVING INC ,
- STONART INC
Completed Inspections
Permit Status: Final
Permit Number: T19RW05058
Permit Description: CLEARING AND GRUBBING ON SITE (FUTURE WORK WILL INCLUDE EXCAVATION, FOR DRIVEWAY ENTRANCES.
09/30/19 - ADDING ADDITIONAL TRAFFIC CONTROL
10/03/19 - PLAN CHANGE - ADDING 24HR CLOSURE
02/05/20 - OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP.
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/05/2019 | TDOT-Routine Barricade Inspect | DR | Approved | Meeting with Reliance Construction. Engineer to address issue of ramp proximity to TEP Power Pole. WIll submit drawing when ready. |