Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T19RW04284
Permit Details
Apply Date:
08/05/2019
Applicant:
TUCSON ELECTRIC POWER **B
Description:
TEP will be replacing/relocating multiple poles along Broadway Blvd. starting at 2030 E BROADWAY BLVD and ending at 2934 E BROADWAY BLVD. TEP will also be replacing multiple spans of overhead conductors. This will correct the conflicts resulting from the Broadway widening project. CIP #SR3A 08/19/19 - Lane closure on eastbound Broadway may be in place at all times with the exception of 3:30 PM - 7:00 PM, when both eastbound travel lanes need to be available to the public. Contractor is to have their barricade company remove the traffic control devices from the roadway at the end of the work shift. If they complete the day's work early they should have the barricade company come out at that time to remove the devices and free up the roadway for motorists and bicyclists. 09/09/19 - TEP will be adding a grade ring to an existing pullbox to meet new final grade. The pullbox is located at 55 n Park Ave on the west side of the street. Sidewalk repair will be completed as needed. (WO# 6272425).
Completed Inspections
Permit Status: Final
Permit Number: T19RW04284
Permit Description: TEP will be replacing/relocating multiple poles along Broadway Blvd. starting at 2030 E BROADWAY BLVD and ending at 2934 E BROADWAY BLVD. TEP will also be replacing multiple spans of overhead conductors. This will correct the conflicts resulting from the Broadway widening project.
CIP #SR3A
08/19/19 - Lane closure on eastbound Broadway may be in place at all times with the exception of 3:30 PM - 7:00 PM, when both eastbound travel lanes need to be available to the public.
Contractor is to have their barricade company remove the traffic control devices from the roadway at the end of the work shift. If they complete the day's work early they should have the barricade company come out at that time to remove the devices and free up the roadway for motorists and bicyclists.
09/09/19 - TEP will be adding a grade ring to an existing pullbox to meet new final grade. The pullbox is located at 55 n Park Ave on the west side of the street. Sidewalk repair will be completed as needed. (WO# 6272425).
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/23/2019 | TDOT-EXCAV GENERAL INSPECTION | Bravin | Approved | all work completed today.Brricades were removed. Old poles are still up and will be removed duruing Broadway construction. No further repairs needed, |