Permit Details

Status:
Final
Type:
Barricade and Excavation
Address:
690 E 19TH ST
Address NEW:
690 E 19TH ST
Apply Date:
07/09/2019
Applicant:
SOUTHWEST GAS
Description:
VSP (2019): MIDTOWN FEEDER REPL 19TH ST - EUCLID TO 10TH AVE - REPLACE 7,089LF IN CITY RIGHT OF WAY (6,736 LF VIA TRENCHING/BORING IN PAVEMENT; 353 LF VIA TRENCHING/BORING IN DIRT) TCPS ATTACHED
Contractors:
  • NIELS FUGAL SONS CO ,
  • NIELS FUGAL SONS COMPANY OF FLORIDA L L C

Outstanding Inspections

Permit Status: Final
Permit Number: T19RW03822
Permite Description: VSP (2019): MIDTOWN FEEDER REPL 19TH ST - EUCLID TO 10TH AVE - REPLACE 7,089LF IN CITY RIGHT OF WAY (6,736 LF VIA TRENCHING/BORING IN PAVEMENT; 353 LF VIA TRENCHING/BORING IN DIRT) TCPS ATTACHED
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/16/2019 TDOT-Routine Barricade Inspect N/A Continued Reopened permit because I was informed by Angel Flores that contractor asked permission to close sb Euclid between 19th and 20th St. for re-work due to work done by an un-certified welder. Made contact with the contractor (Frugal) who stated that the condition of the plates over the bellholes on sb Euclid made for an unsafe condition. I agreed on the condition that the contractor provide MUTCD compliant advanced warning signs on 19th prohibiting left and right turns onto sb Euclid. Will follow up with Mike Bravin to let him know permit is active again.

Completed Inspections

Permit Status: Final
Permit Number: T19RW03822
Permit Description: VSP (2019): MIDTOWN FEEDER REPL 19TH ST - EUCLID TO 10TH AVE - REPLACE 7,089LF IN CITY RIGHT OF WAY (6,736 LF VIA TRENCHING/BORING IN PAVEMENT; 353 LF VIA TRENCHING/BORING IN DIRT) TCPS ATTACHED
Total Completed Inspections - 1
Date Description Inspector Results Comments
08/23/2019 TDOT-EXCAV GENERAL INSPECTION Bravin Approved 1000 LF of 12 in main installed on 20th, Fugal working late to install pipe. $th had to be closed due to the length of pipe and it was better for the bus route to close for one day only.

Fugal started to perm patch excavations

All excavations have been slurried per COT request. No issues at this moment

Documents

File Name Document Type  
T19RW03822.PDF ROW-RIGHT OF WAY VIEW
T19RW03822 R1.PDF ROW-RIGHT OF WAY VIEW