Permit: T19RW03723
Permit Details
Apply Date:
07/01/2019
Applicant:
K E & G CONSTRUCTION ***APA***
Description:
REPAIRING & EXCAVATING 4" PIPE FOR APPROX. 12 FEET PAVEMENT MORATORIUM MILL PAVE 50 FT EACH DIRECTION. 07/31/2019-PLAN CHANGE (PER INSPECTOR) PLEASE EXTEND EXISTING PERMIT: Times for closure to be switched to start time at 6AM to 6pm to allow for milling, sweeping and paving to be completed in one day. Barricades will be removed as soon as the pavement can be driven on. Please extend the permit for 30 days. Work Order number is 190212.
Completed Inspections
Permit Status: Final
Permit Number: T19RW03723
Permit Description: REPAIRING & EXCAVATING 4" PIPE FOR APPROX. 12 FEET
PAVEMENT MORATORIUM MILL PAVE 50 FT EACH DIRECTION.
07/31/2019-PLAN CHANGE (PER INSPECTOR)
PLEASE EXTEND EXISTING PERMIT:
Times for closure to be switched to start time at 6AM to 6pm to allow for milling, sweeping and paving to be completed in one day. Barricades will be removed as soon as the pavement can be driven on.
Please extend the permit for 30 days.
Work Order number is 190212.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/14/2019 | TDOT-EXCAV GENERAL INSPECTION | Bravin | Approved | underground work was completed a while ago, with a slurry backfill. The area was plated until yesterday because 12th was under moratorium. Todays work consisted of C and S milling 3 in of existing asphalt to the limits which were set by me. After mill the roadway was swept and tacked and repaved with material from Vulcan. spent most of the day on site, No issues. |