Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 08/14/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
underground work was completed a while ago, with a slurry backfill. The area was plated until yesterday because 12th was under moratorium. Todays work consisted of C and S milling 3 in of existing asphalt to the limits which were set by me. After mill the roadway was swept and tacked and repaved with material from Vulcan. spent most of the day on site, No issues. |