Permit Details

Status:
Final
Type:
Barricade Only
Address:
6151 S TUCSON BL
Apply Date:
02/21/2019
Applicant:
EAGLE ROCK EXCAVATING L L C
Description:
TRES PUEBLOS ESTE -TUCSON WATER 1-WE WOULD LIKE TO PLACE A 4" DRAINAGE PIPE IN THE GUTTERLINE OF WESTBOUND BILBY, COVERED WITH COLD MIX AZ TO FORM AN ACCESS RAMP OVER THE CURB. THIS WILL BE A TEMPORARY ACCESS POINT TO THE CONSTRUCTION SIE AND WILL ALLOW OUR WATER TRUCK TO ENTER AND EXIT TO FILL FROM THE HYDRANT ACROSS THE STREET. THE 4' PIPE WILL ALLOW WATER TO FLOW AND REDUCE PONDING AT THE RAMP LOCATION.THIS PORTION OF THE PERMIT WILL BE FOR A 24-HOUR SETUP, AND FOR THE FULL REQUESTED DURATION OF THE PERMIT. 03/04/2019-PLAN CHANGE- To get construction water to the project site, we are proposing the installation of a PVC sleeve below pavement on Bilby Rd. We are looking to cut the pavement, trench down 1'-2', and install a 4" or 6" PVC sleeve, then run a fire hose through the sleeve to get from the hydrant to the South over to the job site to the North. After construction, we will remove the sleeve and replace the ACB and AC pavement with a permanent patch. The traffic control plan as submitted previously should allow us to trench across the road in halves to install the sleeve. ** TEMP PATCH MUST BE HOT MIX ASPHALT 06/18/2019-PLAN CHANGE READY TO INSTALL THE 2 NEW PERMANET WATER MAINS ACROSS BILBY. TUCSONS WATER PLAN ATTACHED. THE TRAFFIC CONTROL PLAN AS SUBMITTED PREVIOUSLY SHOULD ALLOW US TO TRENCH ACROSS THE ROAD IN HALVES TO INSTALL THE SLEEVE. 12/03/2019 - PLAN CHANGE We will be relocating the existing storm drain catch basin and pipe per the approved DP and PIA plans (DP18-0212 and T18PI00039). No changes to the traffic control plans is needed for this work. Just an extension of the time needed to perform the work. The start date listed below is the date that the current permit expires, not the start date of the new work. Start date is still to be determined. Work will be completed before 01/31/2020.
Contractors:
  • TRAFFICADE SERVICE INC

Completed Inspections

Permit Status: Final
Permit Number: T19RW00952
Permit Description: TRES PUEBLOS ESTE -TUCSON WATER 1-WE WOULD LIKE TO PLACE A 4" DRAINAGE PIPE IN THE GUTTERLINE OF WESTBOUND BILBY, COVERED WITH COLD MIX AZ TO FORM AN ACCESS RAMP OVER THE CURB. THIS WILL BE A TEMPORARY ACCESS POINT TO THE CONSTRUCTION SIE AND WILL ALLOW OUR WATER TRUCK TO ENTER AND EXIT TO FILL FROM THE HYDRANT ACROSS THE STREET. THE 4' PIPE WILL ALLOW WATER TO FLOW AND REDUCE PONDING AT THE RAMP LOCATION.THIS PORTION OF THE PERMIT WILL BE FOR A 24-HOUR SETUP, AND FOR THE FULL REQUESTED DURATION OF THE PERMIT. 03/04/2019-PLAN CHANGE- To get construction water to the project site, we are proposing the installation of a PVC sleeve below pavement on Bilby Rd. We are looking to cut the pavement, trench down 1'-2', and install a 4" or 6" PVC sleeve, then run a fire hose through the sleeve to get from the hydrant to the South over to the job site to the North. After construction, we will remove the sleeve and replace the ACB and AC pavement with a permanent patch. The traffic control plan as submitted previously should allow us to trench across the road in halves to install the sleeve. ** TEMP PATCH MUST BE HOT MIX ASPHALT 06/18/2019-PLAN CHANGE READY TO INSTALL THE 2 NEW PERMANET WATER MAINS ACROSS BILBY. TUCSONS WATER PLAN ATTACHED. THE TRAFFIC CONTROL PLAN AS SUBMITTED PREVIOUSLY SHOULD ALLOW US TO TRENCH ACROSS THE ROAD IN HALVES TO INSTALL THE SLEEVE. 12/03/2019 - PLAN CHANGE We will be relocating the existing storm drain catch basin and pipe per the approved DP and PIA plans (DP18-0212 and T18PI00039). No changes to the traffic control plans is needed for this work. Just an extension of the time needed to perform the work. The start date listed below is the date that the current permit expires, not the start date of the new work. Start date is still to be determined. Work will be completed before 01/31/2020.
Total Completed Inspections - 1
Date Description Inspector Results Comments
09/11/2019 TDOT-EXCAV GENERAL INSPECTION fsantia1 Approved Excavation work along dodge still needs to be completed multiple temp patches are in place and failing talked to a worker on site made him aware as well as called Richard who is the foreman made him awake of the situation. Yard has been cleared out only final patching is left to be done

Documents

File Name Document Type  
T19RW00952 R1.PDF ROW-RIGHT OF WAY VIEW
T19RW00952 R1.PDF ROW-RIGHT OF WAY VIEW
T19RW00952.PDF ROW-RIGHT OF WAY VIEW
T19RW00952 R2.PDF ROW-RIGHT OF WAY VIEW
T19RW00952 R3.PDF ROW-RIGHT OF WAY VIEW
T19RW00952.PDF ROW-RIGHT OF WAY VIEW