Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 6151 S TUCSON BL
Search
Historic Records Requests
Address: 6151 S TUCSON BL
Date - 11/25/2024 2:33 a.m.
Total Number Of Historic Records Requests - (4)
Name | Action |
---|---|
Address: 6151 S TUCSON BL - Doc Type: CERT OF OCC | |
Address: 6151 S TUCSON BL - Doc Type: CERT OF OCC | |
Address: 6151 S TUCSON BL - Doc Type: CERT OF OCC | |
Address: 6151 S TUCSON BL - Doc Type: CERT OF OCC |
Annexations & Original City Zoning (OCZ)
Address: 6151 S TUCSON BL
Date - 11/25/2024 2:33 a.m.
Total Number Of Annexations & Original City Zoning (1)
Special Development Requests & Requirements
Address: 6151 S TUCSON BL
Date - 11/25/2024 2:33 a.m.
Total Number Of Special Development Permits - (1)
Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T20SA00384 | COMPLETE | 12/28/2020 | N/A | Zoning Adminstration Letter |
Permits
Address: 6151 S TUCSON BL
Date - 11/25/2024 2:33 a.m.
Total Number Of Permits - (16)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TR-UTL-0924-01656 | Inspections | 09/02/2024 | 12/19/2024 | Right-of-Way (ROW) - Utility | P.122865W (KAHNA) - OVERLASH 2,953’ OF AERIAL FIBER CABLE. | |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project | |
TR-ROW-0323-00502 | Complete | 03/16/2023 | 05/10/2023 | Right-of-Way (ROW) | Perform 7-inch diameter soil borings to depths of approximately 3 feet below existing site grade along Bilby Road between 12th Avenue and Country Club Road to obtain soil samples for a pavement section design | |
T03AN00919 | ISSUED | 09/12/2003 | N/A | ADDRNEW | ||
T03BU02343 | FINAL | 09/12/2003 | 08/15/2007 | GRADING | GRADING:14520 CY CUT & 14520 CY FILL | |
T03CM04472 | C OF O | 09/12/2003 | 06/19/2007 | COMBO | NEW:WAREHOUSE BUILDING | |
T05BU02797 | EXPIRED | 11/22/2005 | 09/05/2006 | SPKLR | FIRE SPKR:93 LF OF 8" UNDERGROUND PIPE | |
T05EX00975 | CLOSED | 09/02/2005 | 11/01/2005 | EXCAV | EXCA:TRENCH 50'D (NEW METER INSTALLATION) | |
T06BU00369 | FINAL | 02/17/2006 | 04/30/2007 | SPKLR | ADD:1065 NEW FIRE SPRINKLERS | |
T06EX00268 | CLOSED | 02/15/2006 | 08/22/2006 | EXCAV | 3 - 35' DRIVEWAYS AND SIDEWALKS | |
T06EX00580 | WITHDRWN | 04/25/2006 | 06/24/2006 | EXCAV | 3 NEW 35' DRIVEWAYS AND SIDEWALKS | |
T07OT01900 | C OF O | 08/23/2007 | 02/23/2008 | C-OF-O | C OF O: SOLAR INDUSTRIES INC | |
T08EX00360 | CLOSED | 04/29/2008 | 06/28/2008 | EXCAV | EXCA:REMOVE & REPLACE 8 CURB ACCESS RAMPS | |
T19RW00952 | FINAL | 02/21/2019 | 01/02/2020 | ROW | TRES PUEBLOS ESTE -TUCSON WATER 1-WE WOULD LIKE TO PLACE A 4" DRAINAGE PIPE IN THE GUTTERLINE OF WESTBOUND BILBY, COVERED WITH COLD MIX AZ TO FORM AN ACCESS RAMP OVER THE CURB. THIS WILL BE A TEMPORARY ACCESS POINT TO THE CONSTRUCTION SIE AND WILL ALLOW OUR WATER TRUCK TO ENTER AND EXIT TO FILL FROM THE HYDRANT ACROSS THE STREET. THE 4' PIPE WILL ALLOW WATER TO FLOW AND REDUCE PONDING AT THE RAMP LOCATION.THIS PORTION OF THE PERMIT WILL BE FOR A 24-HOUR SETUP, AND FOR THE FULL REQUESTED DURATION OF THE PERMIT. 03/04/2019-PLAN CHANGE- To get construction water to the project site, we are proposing the installation of a PVC sleeve below pavement on Bilby Rd. We are looking to cut the pavement, trench down 1'-2', and install a 4" or 6" PVC sleeve, then run a fire hose through the sleeve to get from the hydrant to the South over to the job site to the North. After construction, we will remove the sleeve and replace the ACB and AC pavement with a permanent patch. The traffic control plan as submitted previously should allow us to trench across the road in halves to install the sleeve. ** TEMP PATCH MUST BE HOT MIX ASPHALT 06/18/2019-PLAN CHANGE READY TO INSTALL THE 2 NEW PERMANET WATER MAINS ACROSS BILBY. TUCSONS WATER PLAN ATTACHED. THE TRAFFIC CONTROL PLAN AS SUBMITTED PREVIOUSLY SHOULD ALLOW US TO TRENCH ACROSS THE ROAD IN HALVES TO INSTALL THE SLEEVE. 12/03/2019 - PLAN CHANGE We will be relocating the existing storm drain catch basin and pipe per the approved DP and PIA plans (DP18-0212 and T18PI00039). No changes to the traffic control plans is needed for this work. Just an extension of the time needed to perform the work. The start date listed below is the date that the current permit expires, not the start date of the new work. Start date is still to be determined. Work will be completed before 01/31/2020. | |
T20RW01807 | FINAL | 03/20/2020 | 08/21/2020 | ROW | Setting 5 new poles, and doing work on 2 existing poles. Running 3Ø 477 ACSR approx 1754' along the east side of Tucson Blvd between Commerce Center Pl and Bilby Rd to allow for future feeder tie and service to new subdivision. | |
T20RW03823 | FINAL | 07/07/2020 | 08/15/2020 | ROW | TRES PUEBLO ESTE, PIA T18PIOOO39 Landscape gravel shooting on the south side of East Bilby Road and the east site of South Tucson Blvd NOTES: OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROL AND WORKERS. ADDRESS CHANGE FROM: "East Bilby Road and South Tucson Blve" TO "6151 S Tucson BL" |