Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel14027042B
14027041A
JurisdictionTucson
City of Tucson ZoningI-1, P-I
Water Course

Washes

Tucson WardWard 5
Major Streets & Routes

Gateway Route

,

Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Historic Records Requests

Address: 6151 S TUCSON BL
Date - 11/10/2024 5:41 p.m.
Total Number Of Historic Records Requests - (4)
Name Action
Address: 6151 S TUCSON BL - Doc Type: CERT OF OCC VIEW
Address: 6151 S TUCSON BL - Doc Type: CERT OF OCC VIEW
Address: 6151 S TUCSON BL - Doc Type: CERT OF OCC VIEW
Address: 6151 S TUCSON BL - Doc Type: CERT OF OCC VIEW

Annexations & Original City Zoning (OCZ)

Address: 6151 S TUCSON BL
Date - 11/10/2024 5:41 p.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 2045

Special Development Requests & Requirements

Address: 6151 S TUCSON BL
Date - 11/10/2024 5:41 p.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Unit Type Description
T20SA00384 COMPLETE 12/28/2020 N/A Zoning Adminstration Letter

Permits

Address: 6151 S TUCSON BL
Date - 11/10/2024 5:41 p.m.
Total Number Of Permits - (16)
Permit Status Apply Date Expired Date Unit Type Description
TR-UTL-0924-01656 Issued 09/02/2024 12/19/2024 Right-of-Way (ROW) - Utility P.122865W (KAHNA) - OVERLASH 2,953’ OF AERIAL FIBER CABLE.
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0323-00502 Complete 03/16/2023 05/10/2023 Right-of-Way (ROW) Perform 7-inch diameter soil borings to depths of approximately 3 feet below existing site grade along Bilby Road between 12th Avenue and Country Club Road to obtain soil samples for a pavement section design
T03AN00919 ISSUED 09/12/2003 N/A ADDRNEW
T03BU02343 FINAL 09/12/2003 08/15/2007 GRADING GRADING:14520 CY CUT & 14520 CY FILL
T03CM04472 C OF O 09/12/2003 06/19/2007 COMBO NEW:WAREHOUSE BUILDING
T05BU02797 EXPIRED 11/22/2005 09/05/2006 SPKLR FIRE SPKR:93 LF OF 8" UNDERGROUND PIPE
T05EX00975 CLOSED 09/02/2005 11/01/2005 EXCAV EXCA:TRENCH 50'D (NEW METER INSTALLATION)
T06BU00369 FINAL 02/17/2006 04/30/2007 SPKLR ADD:1065 NEW FIRE SPRINKLERS
T06EX00268 CLOSED 02/15/2006 08/22/2006 EXCAV 3 - 35' DRIVEWAYS AND SIDEWALKS
T06EX00580 WITHDRWN 04/25/2006 06/24/2006 EXCAV 3 NEW 35' DRIVEWAYS AND SIDEWALKS
T07OT01900 C OF O 08/23/2007 02/23/2008 C-OF-O C OF O: SOLAR INDUSTRIES INC
T08EX00360 CLOSED 04/29/2008 06/28/2008 EXCAV EXCA:REMOVE & REPLACE 8 CURB ACCESS RAMPS
T19RW00952 FINAL 02/21/2019 01/02/2020 ROW TRES PUEBLOS ESTE -TUCSON WATER 1-WE WOULD LIKE TO PLACE A 4" DRAINAGE PIPE IN THE GUTTERLINE OF WESTBOUND BILBY, COVERED WITH COLD MIX AZ TO FORM AN ACCESS RAMP OVER THE CURB. THIS WILL BE A TEMPORARY ACCESS POINT TO THE CONSTRUCTION SIE AND WILL ALLOW OUR WATER TRUCK TO ENTER AND EXIT TO FILL FROM THE HYDRANT ACROSS THE STREET. THE 4' PIPE WILL ALLOW WATER TO FLOW AND REDUCE PONDING AT THE RAMP LOCATION.THIS PORTION OF THE PERMIT WILL BE FOR A 24-HOUR SETUP, AND FOR THE FULL REQUESTED DURATION OF THE PERMIT. 03/04/2019-PLAN CHANGE- To get construction water to the project site, we are proposing the installation of a PVC sleeve below pavement on Bilby Rd. We are looking to cut the pavement, trench down 1'-2', and install a 4" or 6" PVC sleeve, then run a fire hose through the sleeve to get from the hydrant to the South over to the job site to the North. After construction, we will remove the sleeve and replace the ACB and AC pavement with a permanent patch. The traffic control plan as submitted previously should allow us to trench across the road in halves to install the sleeve. ** TEMP PATCH MUST BE HOT MIX ASPHALT 06/18/2019-PLAN CHANGE READY TO INSTALL THE 2 NEW PERMANET WATER MAINS ACROSS BILBY. TUCSONS WATER PLAN ATTACHED. THE TRAFFIC CONTROL PLAN AS SUBMITTED PREVIOUSLY SHOULD ALLOW US TO TRENCH ACROSS THE ROAD IN HALVES TO INSTALL THE SLEEVE. 12/03/2019 - PLAN CHANGE We will be relocating the existing storm drain catch basin and pipe per the approved DP and PIA plans (DP18-0212 and T18PI00039). No changes to the traffic control plans is needed for this work. Just an extension of the time needed to perform the work. The start date listed below is the date that the current permit expires, not the start date of the new work. Start date is still to be determined. Work will be completed before 01/31/2020.
T20RW01807 FINAL 03/20/2020 08/21/2020 ROW Setting 5 new poles, and doing work on 2 existing poles. Running 3Ø 477 ACSR approx 1754' along the east side of Tucson Blvd between Commerce Center Pl and Bilby Rd to allow for future feeder tie and service to new subdivision.
T20RW03823 FINAL 07/07/2020 08/15/2020 ROW TRES PUEBLO ESTE, PIA T18PIOOO39 Landscape gravel shooting on the south side of East Bilby Road and the east site of South Tucson Blvd NOTES: OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROL AND WORKERS. ADDRESS CHANGE FROM: "East Bilby Road and South Tucson Blve" TO "6151 S Tucson BL"

Plans

Address: 6151 S TUCSON BL
Date - 11/10/2024 5:41 p.m.
Total Number Of Plans - (2)
Plan Number Status Application Date Exp Date Unit Type Description
S18-001 Submitted 01/02/2018 N/A -- Land Split/Lot Split INDUSTRIAL BUILDING AT BILBY
S07-059 EXPIRED 04/24/2007 03/07/2008 LOT SPLIT -- LSPT