Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Permit Details

Status:
Final
Type:
Barricade and Excavation
Address NEW:
2601 N ORCHARD AV
Apply Date:
02/04/2019
Applicant:
SOUTHWEST GAS
Description:
PEM8000 (2019) -ATLAS 0016 ORCHARD AVE AND FLOWER ST. REPLACE 2,366 LF OF NATURAL GAS LINES. 253 LF VIA TRENCHING.BORING IN PAVEMENT; 2,113 LF VIA TRENCHING/BORING IN DIRT; SWG DESIGN. TCPS ATTACHED. NOTE: WORK HOURS ON GLENN ST ARE 9A - 3:30 P WORK HOURS ON ALL OTHER AREAS ARE 7A - 5P
Contractors:
  • QUAIL CONSTRUCTION LLC

Completed Inspections

Permit Status: Final
Permit Number: T19RW00611
Permit Description: PEM8000 (2019) -ATLAS 0016 ORCHARD AVE AND FLOWER ST. REPLACE 2,366 LF OF NATURAL GAS LINES. 253 LF VIA TRENCHING.BORING IN PAVEMENT; 2,113 LF VIA TRENCHING/BORING IN DIRT; SWG DESIGN. TCPS ATTACHED. NOTE: WORK HOURS ON GLENN ST ARE 9A - 3:30 P WORK HOURS ON ALL OTHER AREAS ARE 7A - 5P
Total Completed Inspections - 1
Date Description Inspector Results Comments
06/07/2019 TDOT-EXCAV GENERAL INSPECTION MVV Approved Last driveway completed.

Documents

File Name Document Type  
T19RW00611.PDF ROW-RIGHT OF WAY VIEW
T19RW00611 R1.PDF ROW-RIGHT OF WAY VIEW
T19RW00611 R2.PDF ROW-RIGHT OF WAY VIEW