Permit Details

Status:
Expired
Type:
Residential Building - One or Two Family
Apply Date:
12/13/2019
Applicant:
Description:
SFR DRHOX30E19 T19-M0164

Permit Reviews

Permit Number - T19CM09173
Permit Status: Expired
Permit Description: SFR DRHOX30E19 T19-M0164
Start Date Submittal Complete Date Status  
12/13/2019 RESIDENTIAL - BLDG-MODEL PLAN/ENGINE/WALK THRU 12/13/2019 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T19CM09173
Permit Status: Expired
Permit Description: SFR DRHOX30E19 T19-M0164
Total Outstanding Activity Conditions - 3
Date Name
12/13/2019 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
12/13/2019 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
12/13/2019 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.

Completed Inspections

Permit Status: Expired
Permit Number: T19CM09173
Permit Description: SFR DRHOX30E19 T19-M0164
Total Completed Inspections - 23
Date Description Inspector Results Comments
12/20/2019 COT - RSPL - Rough Soil Passed {Activity date: 12/20/2019; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - }
01/03/2020 COT - RSEL - Grounding/Bonding Passed {Activity date: 01/03/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - }
01/03/2020 COT - RSBU - Preslab Passed {Activity date: 01/03/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - }
01/03/2020 PDSD Building Division - TEP PM Clearance Passed {Activity date: 01/03/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - CODE ECO}
01/03/2020 COT - RSEL - Electrical Underground Passed {Activity date: 01/03/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - }
01/03/2020 COT - RSEL - Construction Power Passed {Activity date: 01/03/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - Approved ok for clearance ECO
}
01/03/2020 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 01/03/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - }
01/22/2020 COT - RSBU - Roof Nailing Passed {Activity date: 01/22/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - }
01/22/2020 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 01/22/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - }
02/26/2020 COT - LCBU - Framing Passed {Activity date: 02/26/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - } ; {Activity date: 02/21/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Shall provide blocking and nail down the truss hangers at stairway.
} ; {Activity date: 02/18/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Shall seal all top plate penetrations with fire rated foam or caulk.
2- Forced air vents require (3) sided blocking.
3- Remove all rocks in water line trench.
INSPECTION STOP!}
02/26/2020 COT - RSPL - Yard Water Line Passed {Activity date: 02/26/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - } ; {Activity date: 02/21/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Yard water line has a leak} ; {Activity date: 02/18/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - INSPECTION STOP!

}
03/04/2020 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 03/04/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by SFLORES2 - } ; {Activity date: 02/28/2020; Status: Not ready for Inspection; Inspector: WGALLAG1; Comment: Entered by DMERANZ1 - } ; {Activity date: 02/26/2020; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - } ; {Activity date: 02/21/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Exhaust fan conductor is not landed master bath.
2- Shall properly secure first floor closet ring
3- Shall provide a clean out at 2 waste stack west wall.
4- Gas pressure test was below 10 psi, check for leaks
5- Split unit B-vent is touching combustible material} ; {Activity date: 02/18/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Shall seal all top plate penetrations with fire rated foam or caulk.
2- Forced air vents require (3) sided blocking.
3- Remove all rocks in water line trench.
INSPECTION STOP!}
03/04/2020 COT - LCPL - Plumbing Intermediate Passed {Activity date: 03/04/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by SFLORES2 - } ; {Activity date: 02/28/2020; Status: Not ready for Inspection; Inspector: WGALLAG1; Comment: Entered by DMERANZ1 - } ; {Activity date: 02/26/2020; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - Clamp 2 vent pipes at front door} ; {Activity date: 02/21/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } ; {Activity date: 02/18/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - INSPECTION STOP!

}
03/04/2020 RSME - Mechanical Progress Passed {Activity date: 03/04/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by SFLORES2 - } ; {Activity date: 02/26/2020; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - Rework furnace exhaust vent
Fresh air supply next to vent pipes} ; {Activity date: 02/21/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } ; {Activity date: 02/18/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - INSPECTION STOP!

}
03/13/2020 COT - HCBU - Interior Shear Bracing Passed {Activity date: 03/13/2020; Status: Approved; Inspector: TVALENCIA; Comment: Entered by SFLORES2 - } ; {Activity date: 03/11/2020; Status: Not ready for Inspection; Inspector: WGALLGHER; Comment: Entered by SFLORES2 - }
03/26/2020 COT - RSPL - Sewer Passed {Activity date: 03/26/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - IVR TT} ; {Activity date: 03/25/2020; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by SFLORES2 - install 5" head for test and install tracer wire.}
04/28/2020 COT - BULD - SWG Clearance Passed {Activity date: 04/28/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - CODE}
04/28/2020 COT - RSPL - Gas Pressure Test Passed {Activity date: 04/28/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Clear Southwest Gas please} ; {Activity date: 02/26/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - } ; {Activity date: 02/18/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - INSPECTION STOP!

}
05/04/2020 COT - RSME - Mechanical Final Passed {Activity date: 05/04/2020; Status: Approved; Inspector: TVALENCIA; Comment: Entered by RSALDAT1 - } ; {Activity date: 02/28/2020; Status: Not ready for Inspection; Inspector: WGALLAG1; Comment: Entered by DMERANZ1 - }
05/04/2020 RSBU - Building Final Passed {Activity date: 05/04/2020; Status: Approved; Inspector: TVALENCIA; Comment: Entered by RSALDAT1 - }
05/04/2020 COT - RSEL - Outdoor Lighting Passed {Activity date: 05/04/2020; Status: Approved; Inspector: TVALENCIA; Comment: Entered by RSALDAT1 - }
05/04/2020 COT - RSPL - Plumbing Final Passed {Activity date: 05/04/2020; Status: Approved; Inspector: TVALENCIA; Comment: Entered by RSALDAT1 - } ; {Activity date: 12/13/2019; Status: Prior to Final Inspectn; Inspector: Gerry Koziol; Comment: Entered by AMARTIN1 - SWR_TRES PUEBLOS ESTE SQ20191720866 LOT 87
SFR - ISSUED WITH PCRWRD CONDITIONS: NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE PUBLIC SEWER G-2018-096 IS ACCEPTED AND RELEASED BY PCRWRD}
05/04/2020 COT - RSEL - Electrical Final Passed {Activity date: 05/04/2020; Status: Approved; Inspector: TVALENCIA; Comment: Entered by RSALDAT1 - }

Documents

File Name Document Type  
None DOCUMENTS VIEW
None CONSTRPLANS VIEW