Permit: T19CM09173
Permit Details
Apply Date:
12/13/2019
Applicant:
Description:
SFR DRHOX30E19 T19-M0164
Permit Reviews
Permit Number - T19CM09173
Permit Status: Expired
Permit Description: SFR DRHOX30E19 T19-M0164
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/13/2019 | RESIDENTIAL - BLDG-MODEL PLAN/ENGINE/WALK THRU | 12/13/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM09173
Permit Status: Expired
Permit Description: SFR DRHOX30E19 T19-M0164
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
12/13/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
12/13/2019 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
12/13/2019 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
Completed Inspections
Permit Status: Expired
Permit Number: T19CM09173
Permit Description: SFR DRHOX30E19 T19-M0164
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/20/2019 | COT - RSPL - Rough Soil | Passed | {Activity date: 12/20/2019; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - } | |
01/03/2020 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 01/03/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - } | |
01/03/2020 | COT - RSBU - Preslab | Passed | {Activity date: 01/03/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - } | |
01/03/2020 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 01/03/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - CODE ECO} | |
01/03/2020 | COT - RSEL - Electrical Underground | Passed | {Activity date: 01/03/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - } | |
01/03/2020 | COT - RSEL - Construction Power | Passed | {Activity date: 01/03/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - Approved ok for clearance ECO } |
|
01/03/2020 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 01/03/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - } | |
01/22/2020 | COT - RSBU - Roof Nailing | Passed | {Activity date: 01/22/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - } | |
01/22/2020 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 01/22/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - } | |
02/26/2020 | COT - LCBU - Framing | Passed | {Activity date: 02/26/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - } ; {Activity date: 02/21/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Shall provide blocking and nail down the truss hangers at stairway. } ; {Activity date: 02/18/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Shall seal all top plate penetrations with fire rated foam or caulk. 2- Forced air vents require (3) sided blocking. 3- Remove all rocks in water line trench. INSPECTION STOP!} |
|
02/26/2020 | COT - RSPL - Yard Water Line | Passed | {Activity date: 02/26/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - } ; {Activity date: 02/21/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Yard water line has a leak} ; {Activity date: 02/18/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - INSPECTION STOP! } |
|
03/04/2020 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 03/04/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by SFLORES2 - } ; {Activity date: 02/28/2020; Status: Not ready for Inspection; Inspector: WGALLAG1; Comment: Entered by DMERANZ1 - } ; {Activity date: 02/26/2020; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - } ; {Activity date: 02/21/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Exhaust fan conductor is not landed master bath. 2- Shall properly secure first floor closet ring 3- Shall provide a clean out at 2 waste stack west wall. 4- Gas pressure test was below 10 psi, check for leaks 5- Split unit B-vent is touching combustible material} ; {Activity date: 02/18/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Shall seal all top plate penetrations with fire rated foam or caulk. 2- Forced air vents require (3) sided blocking. 3- Remove all rocks in water line trench. INSPECTION STOP!} |
|
03/04/2020 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 03/04/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by SFLORES2 - } ; {Activity date: 02/28/2020; Status: Not ready for Inspection; Inspector: WGALLAG1; Comment: Entered by DMERANZ1 - } ; {Activity date: 02/26/2020; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - Clamp 2 vent pipes at front door} ; {Activity date: 02/21/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } ; {Activity date: 02/18/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - INSPECTION STOP! } |
|
03/04/2020 | RSME - Mechanical Progress | Passed | {Activity date: 03/04/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by SFLORES2 - } ; {Activity date: 02/26/2020; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - Rework furnace exhaust vent Fresh air supply next to vent pipes} ; {Activity date: 02/21/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } ; {Activity date: 02/18/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - INSPECTION STOP! } |
|
03/13/2020 | COT - HCBU - Interior Shear Bracing | Passed | {Activity date: 03/13/2020; Status: Approved; Inspector: TVALENCIA; Comment: Entered by SFLORES2 - } ; {Activity date: 03/11/2020; Status: Not ready for Inspection; Inspector: WGALLGHER; Comment: Entered by SFLORES2 - } | |
03/26/2020 | COT - RSPL - Sewer | Passed | {Activity date: 03/26/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - IVR TT} ; {Activity date: 03/25/2020; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by SFLORES2 - install 5" head for test and install tracer wire.} | |
04/28/2020 | COT - BULD - SWG Clearance | Passed | {Activity date: 04/28/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - CODE} | |
04/28/2020 | COT - RSPL - Gas Pressure Test | Passed | {Activity date: 04/28/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Clear Southwest Gas please} ; {Activity date: 02/26/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - } ; {Activity date: 02/18/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - INSPECTION STOP! } |
|
05/04/2020 | COT - RSME - Mechanical Final | Passed | {Activity date: 05/04/2020; Status: Approved; Inspector: TVALENCIA; Comment: Entered by RSALDAT1 - } ; {Activity date: 02/28/2020; Status: Not ready for Inspection; Inspector: WGALLAG1; Comment: Entered by DMERANZ1 - } | |
05/04/2020 | RSBU - Building Final | Passed | {Activity date: 05/04/2020; Status: Approved; Inspector: TVALENCIA; Comment: Entered by RSALDAT1 - } | |
05/04/2020 | COT - RSEL - Outdoor Lighting | Passed | {Activity date: 05/04/2020; Status: Approved; Inspector: TVALENCIA; Comment: Entered by RSALDAT1 - } | |
05/04/2020 | COT - RSPL - Plumbing Final | Passed | {Activity date: 05/04/2020; Status: Approved; Inspector: TVALENCIA; Comment: Entered by RSALDAT1 - } ; {Activity date: 12/13/2019; Status: Prior to Final Inspectn; Inspector: Gerry Koziol; Comment: Entered by AMARTIN1 - SWR_TRES PUEBLOS ESTE SQ20191720866 LOT 87 SFR - ISSUED WITH PCRWRD CONDITIONS: NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE PUBLIC SEWER G-2018-096 IS ACCEPTED AND RELEASED BY PCRWRD} |
|
05/04/2020 | COT - RSEL - Electrical Final | Passed | {Activity date: 05/04/2020; Status: Approved; Inspector: TVALENCIA; Comment: Entered by RSALDAT1 - } |