Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 03/04/2020 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
DMUNIZ |
Approved |
Entered by SFLORES2 - |
| 02/28/2020 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
WGALLAG1 |
Not ready for Inspection |
Entered by DMERANZ1 - |
| 02/26/2020 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
WGALLAGHER |
Not ready for Inspection |
Entered by SFLORES2 - |
| 02/21/2020 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
TVALENCIA |
Denied |
Entered by DMERANZ1 - 1- Exhaust fan conductor is not landed master bath.
2- Shall properly secure first floor closet ring
3- Shall provide a clean out at 2 waste stack west wall.
4- Gas pressure test was below 10 psi, check for leaks
5- Split unit B-vent is touching combustible material |
| 02/18/2020 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
TVALENCIA |
Denied |
Entered by DMERANZ1 - 1- Shall seal all top plate penetrations with fire rated foam or caulk.
2- Forced air vents require (3) sided blocking.
3- Remove all rocks in water line trench.
INSPECTION STOP! |