Permit: T19CM08024
Permit Details
Apply Date:
10/30/2019
Applicant:
CINTHYA JUAREZ
Description:
REMODEL/ AC SWAP
Contractors:
- PAPO CONSTRUCTION. LLC
Permit Reviews
Permit Number - T19CM08024
Permit Status: Final
Permit Description: REMODEL/ AC SWAP
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/10/2020 | REVISION - - 1ST | 01/10/2020 | COMPLETED |
| 10/30/2019 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 10/30/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM08024
Permit Status: Final
Permit Description: REMODEL/ AC SWAP
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/30/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T19CM08024
Permit Description: REMODEL/ AC SWAP
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/22/2019 | FRAMING | DQUINN | Approved | not ready until the guidelines from the last inspection are followed. To repeat, the licensed general contractor must be present for the inspection. If the inspection is recalled without the GC being present, it will be not readied again and a permit re-fee will be charged. |
| 11/22/2019 | RESIDENTIAL INTERMEDIATE | DQUINN | Approved | not ready until the guidelines from the last inspection are followed. To repeat, the licensed general contractor must be present for the inspection. If the inspection is recalled without the GC being present, it will be not readied again and a permit re-fee will be charged. |
| 11/22/2019 | ELECTRIC - SERVICE UPGRADE | DQUINN | Approved | not ready until the guidelines from the last inspection are followed. To repeat, the licensed general contractor must be present for the inspection. If the inspection is recalled without the GC being present, it will be not readied again and a permit re-fee will be charged. |
| 11/22/2019 | ELECTRIC - FINAL | DQUINN | Approved | not ready until the guidelines from the last inspection are followed. To repeat, the licensed general contractor must be present for the inspection. If the inspection is recalled without the GC being present, it will be not readied again and a permit re-fee will be charged. |
| 11/22/2019 | PLUMBING - FINAL | DQUINN | Approved | not ready until the guidelines from the last inspection are followed. To repeat, the licensed general contractor must be present for the inspection. If the inspection is recalled without the GC being present, it will be not readied again and a permit re-fee will be charged. |
| 11/22/2019 | MECHANICAL - FINAL | DQUINN | Approved | not ready until the guidelines from the last inspection are followed. To repeat, the licensed general contractor must be present for the inspection. If the inspection is recalled without the GC being present, it will be not readied again and a permit re-fee will be charged. |
| 11/22/2019 | MECHANICAL - INTERMEDIATE | DQUINN | Approved | not ready until the guidelines from the last inspection are followed. To repeat, the licensed general contractor must be present for the inspection. If the inspection is recalled without the GC being present, it will be not readied again and a permit re-fee will be charged. |
| 12/03/2019 | BUILDING - FINAL | ESTEVENS | Approved | No access code to lock box, no messages, call contact number, left message. Arrived on site at 2:05. |
| 12/03/2019 | BUILDING - FINAL | DQUINN | Approved | 1. ADD KIT COUNTER GFI'S WHERE NEEDED. 2. CORRECT FLUES AND CONNECTIONS. 3. ADD CO DETECTOR. 4. GET LETTER FROM LIC. ELEC. ON ENTIRE SYSTEM. |