Permit Details

Status:
Final
Type:
MULTI FAMILY ALTERATION
Address:
2300 N 2ND AV
Address NEW:
2300 N 2ND AV
Apply Date:
10/30/2019
Applicant:
CINTHYA JUAREZ
Description:
REMODEL/ AC SWAP
Contractors:
  • PAPO CONSTRUCTION. LLC

Permit Reviews

Permit Number - T19CM08024
Permit Status: Final
Permit Description: REMODEL/ AC SWAP
Start Date Submittal Complete Date Status  
01/10/2020 REVISION - - 1ST 01/10/2020 COMPLETED Review Details
10/30/2019 RESIDENTIAL - BLDG/ZONING-WALKTHRU 10/30/2019 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T19CM08024
Permit Status: Final
Permit Description: REMODEL/ AC SWAP
Total Outstanding Activity Conditions - 1
Date Name
10/30/2019 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T19CM08024
Permit Description: REMODEL/ AC SWAP
Total Completed Inspections - 9
Date Description Inspector Results Comments
11/22/2019 FRAMING DQUINN Approved not ready until the guidelines from the last inspection are followed.
To repeat, the licensed general contractor must be present for the inspection.
If the inspection is recalled without the GC being present, it will be not readied again and a permit re-fee will be charged.
11/22/2019 RESIDENTIAL INTERMEDIATE DQUINN Approved not ready until the guidelines from the last inspection are followed.
To repeat, the licensed general contractor must be present for the inspection.
If the inspection is recalled without the GC being present, it will be not readied again and a permit re-fee will be charged.
11/22/2019 ELECTRIC - SERVICE UPGRADE DQUINN Approved not ready until the guidelines from the last inspection are followed.
To repeat, the licensed general contractor must be present for the inspection.
If the inspection is recalled without the GC being present, it will be not readied again and a permit re-fee will be charged.
11/22/2019 ELECTRIC - FINAL DQUINN Approved not ready until the guidelines from the last inspection are followed.
To repeat, the licensed general contractor must be present for the inspection.
If the inspection is recalled without the GC being present, it will be not readied again and a permit re-fee will be charged.
11/22/2019 PLUMBING - FINAL DQUINN Approved not ready until the guidelines from the last inspection are followed.
To repeat, the licensed general contractor must be present for the inspection.
If the inspection is recalled without the GC being present, it will be not readied again and a permit re-fee will be charged.
11/22/2019 MECHANICAL - FINAL DQUINN Approved not ready until the guidelines from the last inspection are followed.
To repeat, the licensed general contractor must be present for the inspection.
If the inspection is recalled without the GC being present, it will be not readied again and a permit re-fee will be charged.
11/22/2019 MECHANICAL - INTERMEDIATE DQUINN Approved not ready until the guidelines from the last inspection are followed.
To repeat, the licensed general contractor must be present for the inspection.
If the inspection is recalled without the GC being present, it will be not readied again and a permit re-fee will be charged.
12/03/2019 BUILDING - FINAL ESTEVENS Approved No access code to lock box, no messages, call contact number, left message. Arrived on site at 2:05.
12/03/2019 BUILDING - FINAL DQUINN Approved 1. ADD KIT COUNTER GFI'S WHERE NEEDED.
2. CORRECT FLUES AND CONNECTIONS.
3. ADD CO DETECTOR.
4. GET LETTER FROM LIC. ELEC. ON ENTIRE SYSTEM.

Documents

File Name Document Type  
001_SHEET 1 OF 4.TIF CONSTRPLANS VIEW
002_SHEET 2 OF 4.TIF CONSTRPLANS VIEW
003_SHEET 3 OF 4.TIF CONSTRPLANS VIEW
004_SHEET 4 OF 4.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW
SCAN_BSTEVEN2_2020-01-22-12-02-57.PDF DOCUMENTS VIEW