Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Denied
Inspection History: PLUMBING - FINAL
Permit Number - T19CM08024
Inspection Description - PLUMBING - FINAL
Inspection Status - Denied
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/22/2020 | PLUMBING - FINAL | Denied | No correction have been made. No combustion air in mechanical room, no CO detectors. | |
| 01/22/2020 | PLUMBING - FINAL | Approved | RVI - WORK WAS DONE WITHOUT PERMIT, BUT PAPO CONSTRUCTION PROVIDED A LETTER ACCEPTING RESPONSIBLILTY AS THE GC FOR THIS PROJECT. ALL LETTERS WILL BE ON RECORD FOR THIS PROPERTY. | |
| 01/08/2020 | PLUMBING - FINAL | Denied | New condenser and heating unit, not on plan. Missing safety caps and is over fused. No new electric panel. Incorrectly wired in dining room. Provide letters from registered contractors to verify intermediate trades. |
|
| 01/03/2020 | PLUMBING - FINAL | Not ready for Inspection | ||
| 11/22/2019 | PLUMBING - FINAL | Not ready for Inspection | not ready until the guidelines from the last inspection are followed. To repeat, the licensed general contractor must be present for the inspection. If the inspection is recalled without the GC being present, it will be not readied again and a permit re-fee will be charged. |
|
| 11/01/2019 | PLUMBING - FINAL | Not ready for Inspection | It appears that no intermediate inspections took place on this project. A cursory walk through found many discrepancies present. Recall with licensed general contractor on site for inspection, along with the plans. |