Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
C of o
Type:
MULTI FAMILY NEW
Apply Date:
10/11/2019
Applicant:
N/A
Description:
NEW 14-UNIT MULTI-FAMILY DEVELOPMENT
Contractors:
  • CANYON BUILDING AND DESIGN LLC *APA*

Permit Reviews

Permit Number - T19CM07524
Permit Status: C of o
Permit Description: NEW 14-UNIT MULTI-FAMILY DEVELOPMENT
Start Date Submittal Complete Date Status  
01/21/2020 RESUBMITTAL 01/30/2020 COMPLETED Review Details
09/02/2020 REVISION - - 1ST 09/17/2020 COMPLETED Review Details
10/11/2019 PLANS OK TO SUBMIT - COMM 11/07/2019 COMPLETED Review Details
10/30/2019 COMMERCIAL - NEW 12/02/2019 COMPLETED Review Details
12/03/2019 RESUBMITTAL 01/21/2020 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T19CM07524
Permit Status: C of o
Permit Description: NEW 14-UNIT MULTI-FAMILY DEVELOPMENT
Total Outstanding Activity Conditions - 1
Date Name
10/11/2019 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T19CM07524
Permit Description: NEW 14-UNIT MULTI-FAMILY DEVELOPMENT
Total Completed Inspections - 37
Date Description Inspector Results Comments
07/29/2020 PLUMBING - ROUGH, SOIL WGALLAGHER Approved Partial approval West building only ok to cover
07/31/2020 PLUMBING - PRE SLAB TTREMBULAK Approved Approved
08/07/2020 TEP CLEARANCE - PM ESTEVENS Approved CODE TMPP
08/07/2020 ELECTRIC - CONSTRUCTION POWER ESTEVENS Approved Approved. The TEP clearance code is TMPP.
08/11/2020 ELECTRIC - UFER ESTEVENS Approved Both are approved.
08/11/2020 BUILDING PRE-SLAB ESTEVENS Approved Both are approved.
08/26/2020 EXCAVATION/LAYOUT REBAR & ZON ESTEVENS Approved Partial. Site wall. From Northwest corner to southwest corner to due East to existing site wall.
08/28/2020 SITE - SEWER ESTEVENS Approved Partial. From street manhole, 8 inch line to private manhole. From private manhole, two 4 inch lines to each building. Ok for depth, not under test.
09/04/2020 PLUMBING - YARD WTR LINE/TEST ESTEVENS Approved Partial. From both buildings to the property line.
09/18/2020 EXT METAL CLIPS/EXT SHEATHING DQUINN Approved Ap
Bldg 1
09/30/2020 ELECTRIC - INTERMEDIATE ESTEVENS Approved Approved. Units 1101, 1102, 1103, 1104, 1105.
10/01/2020 ROOF NAILING ENEWCOMB Approved
10/19/2020 MECHANICAL - INTERMEDIATE DQUINN Approved Frame in all units of bldg 1, ok to cover. All demising walls 5/8 rock ok to tape and fire caulk on 1 side only.
4 light pole footings and ufers ok to pour.
10/19/2020 PLUMBING - INTERMEDIATE DQUINN Approved
10/19/2020 ELECTRIC - ABOVE CEILING DQUINN Approved Frame in all units of bldg 1, ok to cover. All demising walls 5/8 rock ok to tape and fire caulk on 1 side only.
4 light pole footings and ufers ok to pour.
10/19/2020 ELECTRIC - UNDERGROUND DQUINN Approved Frame in all units of bldg 1, ok to cover. All demising walls 5/8 rock ok to tape and fire caulk on 1 side only.
4 light pole footings and ufers ok to pour.
10/19/2020 BUILDING ABOVE CEILING DQUINN Approved Frame in all units of bldg 1, ok to cover. All demising walls 5/8 rock ok to tape and fire caulk on 1 side only.
4 light pole footings and ufers ok to pour.
10/19/2020 FRAMING DQUINN Approved All frame ok to cover except open side of demising walls. Need to inspect 5/8 x nailing and final fire caulk.
10/28/2020 MECHANICAL - ABOVE CEILING DQUINN Approved Ap
10/29/2020 SHEET ROCK NAILING DQUINN Approved Ap
12/01/2020 ELECTRIC - PROGRESS DQUINN Approved Underground to main bldg panel and risers and grounding ok to backfill.
01/20/2021 PLUMBING - FINAL DQUINN Approved APPROVED
01/20/2021 MECHANICAL - FINAL DQUINN Approved APPROVED
01/20/2021 ELECTRIC - FINAL DQUINN Approved APPROVED
01/20/2021 OUTDOOR LIGHTING FINAL DQUINN Approved APPROVED
01/20/2021 ELECTRIC - OUTDOOR LIGHTING DQUINN Approved APPROVED
01/20/2021 U VALUE FOR WINDOW DQUINN Approved APPROVED
01/20/2021 FIRE - ALARM FINAL wmotto1 Approved
01/28/2021 STUCCO MESH DQUINN Approved APPROVED
01/28/2021 FIRE - FINAL CBASALDUA Approved
01/28/2021 FIRE SPKLR - FINAL CBASALDUA Approved
02/02/2021 BUILDING - FINAL JG3 Approved
02/02/2021 BUILDING - PROGRESS JG3 Approved
02/02/2021 PLUMBING - ABOVE CEILING JG3 Approved
02/02/2021 PLUMBING - SEWER HCS CONNECT JG3 Approved
02/02/2021 PLUMBING - PROGRESS JG3 Approved
02/02/2021 MECHANICAL - PROGRESS JG3 Approved

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
C OF O.PDF DOCUMENTS VIEW
COT FEE SHEET.PDF DOCUMENTS VIEW
COT INSPECTIONS.PDF DOCUMENTS VIEW
COT PLAN REVIEW CARD.PDF DOCUMENTS VIEW
GEO REPORT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
ORACLE INSPECTION MEMO BLDG1.PDF DOCUMENTS VIEW
ORACLE TRUSS CALCS.PDF DOCUMENTS VIEW
ORACLE TRUSS LAYOUT.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SPECIAL_INSPECTION_CERTIFICATE.PDF DOCUMENTS VIEW
STRUC CALCS.PDF DOCUMENTS VIEW
TRUSS CUT SHEET (1).PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
ORACLE TRUSS CALCS (1).PDF DOCUMENTS VIEW
ORACLE TRUSS LAYOUT.PDF DOCUMENTS VIEW
ALBORADA ORACLE SIGNED GC LETTERS FOR COT.PDF DOCUMENTS VIEW