Permit: T19CM07358
Permit Details
Apply Date:
10/08/2019
Applicant:
Description:
E - INSTALL ROOFTOP SOLAR SYSTEM
Permit Reviews
Permit Number - T19CM07358
Permit Status: Expired
Permit Description: E - INSTALL ROOFTOP SOLAR SYSTEM
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/08/2019 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 10/15/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM07358
Permit Status: Expired
Permit Description: E - INSTALL ROOFTOP SOLAR SYSTEM
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
10/08/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
10/08/2019 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Completed Inspections
Permit Status: Expired
Permit Number: T19CM07358
Permit Description: E - INSTALL ROOFTOP SOLAR SYSTEM
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/04/2019 | BULD - Electrical Clearance | Passed | {Activity date: 12/04/2019; Status: Approved; Inspector: JCLAXTON; Comment: Entered by SFLORES2 - CODE INCR} | |
12/04/2019 | COT - RSEL - Service Upgrade | Passed | {Activity date: 12/04/2019; Status: Approved; Inspector: JCLAXTON; Comment: Entered by SFLORES2 - } ; {Activity date: 11/27/2019; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Roof jack required at riser through roof. Gas bond to be on house side of meter, downstream of all dielectric unions.} ; {Activity date: 11/22/2019; Status: Correction Required; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - Grounding Electrode Conductor must run continuously from service to one of the electrodes; can not be a separate one for each ground rod.} | |
01/30/2020 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 01/30/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - CODE DGC} | |
01/30/2020 | RSBU - Building Final | Passed | {Activity date: 01/30/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - } ; {Activity date: 01/22/2020; Status: Correction Required; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - Provide ladder for inspection.} | |
01/30/2020 | COT - RSEL - Electrical Final | Passed | {Activity date: 01/30/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - ok for clearance DGC} ; {Activity date: 01/22/2020; Status: Correction Required; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - Install PV breaker per plan. } ; {Activity date: 11/22/2019; Status: Not ready for Inspection; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - Work incomplete.} |