Permit Details

Status:
L of c
Type:
SOLAR WAIVER - COMM
Apply Date:
09/13/2019
Applicant:
FRANK ANZALDUA -SOLON CORPORATION
Description:
PV PARKING SHADE CANOPIES
Contractors:
  • SOLON CORPORATION
  • SOLON CORPORATION ***APA***

Permit Reviews

Permit Number - T19CM06689
Permit Status: L of c
Permit Description: PV PARKING SHADE CANOPIES
Start Date Submittal Complete Date Status  
09/13/2019 PLANS OK TO SUBMIT - COMM 09/13/2019 COMPLETED Review Details
09/13/2019 COMMERCIAL - BLDG/FIRE/ZONING/ENG 10/17/2019 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T19CM06689
Permit Status: L of c
Permit Description: PV PARKING SHADE CANOPIES
Total Outstanding Activity Conditions - 1
Date Name
09/13/2019 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: L of c
Permit Number: T19CM06689
Permit Description: PV PARKING SHADE CANOPIES
Total Completed Inspections - 10
Date Description Inspector Results Comments
10/24/2019 ELECTRIC - UFER TVALENCIA Approved 1- columns B and C hole depth is okay and Ufer conductor provided.
10/24/2019 EXCAVATION/LAYOUT REBAR & ZON TVALENCIA Approved 1- columns B and C hole depth is okay and Ufer conductor provided.
11/07/2019 ELECTRIC - UNDERGROUND TVALENCIA Approved 1- Underground electric conduits are okay to cover from AC disconnect to pull box and from pull box to SES and from pull box to the curb towards Canopy A only.
11/14/2019 FRAMING ESTEVENS Approved Canopies B&C.
12/11/2019 TEP CLEARANCE - PM DMUNIZ Approved CODE RECN/DGL
12/11/2019 ELECTRIC - RECONNECT DMUNIZ Approved Inspection for Interconnection of phase 1 PV system, from Disconnect #2 to Existing 600AMP 480/277V SES. Parallel #350MCM Ungrounded Conductors, Parallel #1AWG Grnd/Neutral. Interconnection on Existing lugs, no modifications done to SES. Verbal Clearance sent to TEP @ 7:05AM (RECN/DGL).
02/12/2020 ENGINEERING - FINAL BBENEDON Approved
02/12/2020 ELECTRIC - FINAL TVALENCIA Approved Clear electric DGC
02/12/2020 ELECTRIC - OUTDOOR LIGHTING TVALENCIA Approved
02/14/2020 BUILDING - FINAL TVALENCIA Approved