Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T19CM05056
Permit Details
Apply Date:
07/16/2019
Applicant:
GAS INSTALLATIONS
Description:
NEW GAS LINE FROM METER ACROSS ROOF TO HEAT PACKS AND DOWN INTO KITCHEN AND WATER HEATER
Contractors:
- GAS INSTALLATIONS
Permit Reviews
Permit Number - T19CM05056
Permit Status: Final
Permit Description: NEW GAS LINE FROM METER ACROSS ROOF TO HEAT PACKS AND DOWN INTO KITCHEN AND WATER HEATER
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/16/2019 | WALK THRU - COMM | 07/17/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM05056
Permit Status: Final
Permit Description: NEW GAS LINE FROM METER ACROSS ROOF TO HEAT PACKS AND DOWN INTO KITCHEN AND WATER HEATER
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
07/16/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T19CM05056
Permit Description: NEW GAS LINE FROM METER ACROSS ROOF TO HEAT PACKS AND DOWN INTO KITCHEN AND WATER HEATER
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/19/2019 | PLUMBING - GAS PRESSURE TEST | MHASSAN | Approved | OK to clear gas for reconnection |
07/24/2019 | GAS CLEARANCE | MHASSAN | Approved | |
07/24/2019 | PLUMBING - FINAL | MHASSAN | Approved | according to contractor missing regulators were on a small front part of the roof that was not inspected. No gas clearance needed as SW Gas has already turned it back on. |
07/24/2019 | PLUMBING - FINAL | MHASSAN | Approved | regulators are not installed per drawing. There are several missing and the two that are installed appear to be in different locations than the drawing. Please build per drawing or have drawing revised and re-stamped. |