Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
Permit Number - T19CM05056
Inspection Description - PLUMBING - FINAL
Inspection Status - Not ready for Inspection
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/24/2019 | PLUMBING - FINAL | Not ready for Inspection | regulators are not installed per drawing. There are several missing and the two that are installed appear to be in different locations than the drawing. Please build per drawing or have drawing revised and re-stamped. | |
07/24/2019 | PLUMBING - FINAL | Approved | according to contractor missing regulators were on a small front part of the roof that was not inspected. No gas clearance needed as SW Gas has already turned it back on. | |
07/19/2019 | PLUMBING - FINAL | Partial Approval | still need to inspect on top of roof, due to new roofing material I was not allowed to walk on the roof at time of inspection. |