Permit: T19CM05004
Permit Details
Apply Date:
07/12/2019
Applicant:
ERIC GONZALES
Description:
REMODEL: CONVERTING GARAGE TO BEDROOM AND BATHROOM
Permit Reviews
Permit Number - T19CM05004
Permit Status: Final
Permit Description: REMODEL: CONVERTING GARAGE TO BEDROOM AND BATHROOM
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/07/2020 | REVISION - - 1ST | 01/07/2020 | COMPLETED |
07/12/2019 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 11/14/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM05004
Permit Status: Final
Permit Description: REMODEL: CONVERTING GARAGE TO BEDROOM AND BATHROOM
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
07/12/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T19CM05004
Permit Description: REMODEL: CONVERTING GARAGE TO BEDROOM AND BATHROOM
Total Completed Inspections - 10
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/14/2019 | ZONING - FINAL | AHINES2 | Approved | Revise the plan set to show compliance with UDC 4.9.7.B.7. On the site plan, dimension the 3rd parking space, keynote the space and vehicle use area to the space is dustproof with a minimum of two inches of compacted pea gravel. The 3rd parking space shall be behind the front plane of the house, so the fence may need to be removed to accommodate the parking space. |
01/08/2020 | PLUMBING - ROUGH, SOIL | ESTEVENS | Approved | |
01/14/2020 | MECHANICAL - INTERMEDIATE | DQUINN | Approved | |
01/14/2020 | FRAMING | DQUINN | Approved | |
01/14/2020 | REINFORCED MASONRY PRE-GROUT | DQUINN | Approved | Garage door openings infilled and ok. |
03/18/2020 | RESIDENTIAL INTERMEDIATE | ESTEVENS | Approved | ALL FINALS HAVE BEEN APPROVED |
03/18/2020 | MECHANICAL - FINAL | ESTEVENS | Approved | |
03/18/2020 | PLUMBING - FINAL | ESTEVENS | Approved | |
03/18/2020 | BUILDING - FINAL | ESTEVENS | Approved | |
03/18/2020 | ELECTRIC - FINAL | ESTEVENS | Approved |