Permit: T19CM04911
Permit Details
Apply Date:
07/10/2019
Applicant:
LEO J MILLER
Description:
E - 1388 SQ FT ADDITION TO BUILDING
Contractors:
- EARTH BUILDER CONSTRUCTION L L C
Permit Reviews
Permit Number - T19CM04911
Permit Status: Final
Permit Description: E - 1388 SQ FT ADDITION TO BUILDING
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/16/2019 | PLANS OK TO SUBMIT - COMM | 09/25/2019 | COMPLETED |
10/24/2019 | COMMERCIAL - NEW | 01/09/2020 | COMPLETED |
11/05/2019 | COMMERCIAL - NEW | 11/20/2019 | COMPLETED |
11/25/2019 | COMMERCIAL - NEW | 12/10/2019 | COMPLETED |
12/10/2019 | COMMERCIAL - NEW | 01/21/2020 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM04911
Permit Status: Final
Permit Description: E - 1388 SQ FT ADDITION TO BUILDING
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
07/10/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T19CM04911
Permit Description: E - 1388 SQ FT ADDITION TO BUILDING
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/24/2020 | PLUMBING - PRE SLAB | WGALLAG1 | Approved | |
01/24/2020 | PLUMBING - ROUGH, SOIL | WGALLAG1 | Approved | |
01/24/2020 | BUILDING PRE-SLAB | WGALLAG1 | Approved | |
01/24/2020 | EXCAVATION/LAYOUT REBAR & ZON | WGALLAG1 | Approved | |
02/18/2020 | FRAMING | JBURGE | Approved | |
02/18/2020 | EXT METAL CLIPS/EXT SHEATHING | JBURGE | Approved | Ok to cover exterior walls. |
02/18/2020 | ROOF NAILING | JBURGE | Approved | Ok to dry-in roof system. |
02/24/2020 | PLUMBING - PROGRESS | TVALENCIA | Approved | |
02/24/2020 | ELECTRIC - PROGRESS | TVALENCIA | Approved | |
02/24/2020 | ELECTRIC - INTERMEDIATE | TVALENCIA | Approved | |
02/26/2020 | PLUMBING - INTERMEDIATE | MRAMBER | Approved | |
03/09/2020 | MECHANICAL - ABOVE CEILING | JBURGE | Approved | Duct system in place. Ok to insulate progress areas. |
03/16/2020 | SHEET ROCK NAILING | ESTEVENS | Approved | |
04/16/2020 | TEP CLEARANCE - PM | TVALENCIA | Approved | CODE INCR |
04/16/2020 | ELECTRIC - SERVICE UPGRADE | TVALENCIA | Approved | Clear electric Incr Verbal clearance called in at 12:50 pm. |
10/09/2020 | MECHANICAL - FINAL | ESTEVENS | Approved | Both are approved. |
10/09/2020 | PLUMBING - FINAL | ESTEVENS | Approved | Both are approved. |
10/13/2020 | ENGINEERING - FINAL | DROBERTS | Approved | FINAL IS APPROVED AT THIS TIME WITH THE FOLLOWING STIPULATION. THE CONTRACTOR AND OWNER HAVE BEEN ADVISED THAT THE ADA PARKING SPACES, ACCESS AISLES, AND PATHWAYS ARE NON-COMPLIANT FOR THE CROSS SLOPES, THEY EXCEED THE MAXIMUM 2%. THE CONTRACTOR ADVISED ME THAT THEY WERE NOT REQUIRED TO PERFORM THIS WORK, THE OAINT WAS REDONE SO THAT IT COULD BE SEEN SINCE THE EXISTING OAINT WAS FADED. I CONTACTED STEVE SHIELDS TO DISCUSS THE ADA PARKING AND ACCESS FOR THIS SITE. ALL ADA ACCESS PARKING SPACES AND ACCESS AISLE WERE NOT REVIEWED, THEY WERE NOTED AS BE EXISTING. WE HAVE DISCUSSED MAKING THE APPROVAL ON THIS INSPECTION NOTING THAT ALL PARTIES HAVE BEEN ADVISED OF THE NON COMPLIANT AREAS. |
10/13/2020 | MECHANICAL - PROGRESS | BSTEVENS | Approved | |
10/13/2020 | ELECTRIC - FINAL | BSTEVENS | Approved | |
10/13/2020 | MECHANICAL - INTERMEDIATE | BSTEVENS | Approved | |
10/14/2020 | FIRE - FINAL | jfordney | Approved | |
11/24/2020 | BUILDING - FINAL | BSTEVENS | Approved |