Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Expired
Type:
Residential Building - One or Two Family
Apply Date:
07/05/2019
Applicant:
Description:
SFR F50A19 T19-M0034

Permit Reviews

Permit Number - T19CM04818
Permit Status: Expired
Permit Description: SFR F50A19 T19-M0034
Start Date Submittal Complete Date Status  
07/05/2019 RESIDENTIAL - BLDG/ZONING-WALKTHRU 07/08/2019 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T19CM04818
Permit Status: Expired
Permit Description: SFR F50A19 T19-M0034
Total Outstanding Activity Conditions - 1
Date Name
07/05/2019 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Outstanding Inspections

Permit Status: Expired
Permit Number: T19CM04818
Permite Description: SFR F50A19 T19-M0034
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
11/04/2022 COT - RSME - Mechanical Final N/A Canceled Inspection Canceled
11/04/2022 RSBU - Building Final N/A Canceled Inspection Canceled
11/04/2022 COT - RSEL - Outdoor Lighting N/A Canceled Inspection Canceled
11/04/2022 COT - RSPL - Plumbing Final N/A Canceled Inspection Canceled
11/04/2022 COT - RSEL - Electrical Final N/A Canceled Inspection Canceled
11/07/2022 COT - LCBU - Framing N/A Canceled Inspection Canceled

Completed Inspections

Permit Status: Expired
Permit Number: T19CM04818
Permit Description: SFR F50A19 T19-M0034
Total Completed Inspections - 15
Date Description Inspector Results Comments
09/05/2019 COT - RSPL - Yard Water Line Passed {Activity date: 09/05/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - (RVI)}
09/05/2019 COT - RSPL - Sewer Passed {Activity date: 09/05/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - (RVI)}
09/05/2019 COT - RSPL - Rough Soil Passed {Activity date: 09/05/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - (RVI)}
09/09/2019 COT - RSEL - Grounding/Bonding Passed {Activity date: 09/09/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - (RVI)}
09/09/2019 COT - RSBU - Preslab Passed {Activity date: 09/09/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - (RVI)}
09/09/2019 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 09/09/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - (RVI)}
10/01/2019 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 10/01/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - }
10/02/2019 COT - RSBU - Roof Nailing Passed {Activity date: 10/02/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/01/2019; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - work not complete}
10/25/2019 PDSD Building Division - TEP PM Clearance Passed {Activity date: 10/25/2019; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - CODE ECO}
10/25/2019 COT - RSEL - Electrical Underground Passed {Activity date: 10/25/2019; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - }
10/25/2019 COT - RSEL - Construction Power Passed {Activity date: 10/25/2019; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - Clear TEP (ECO).}
10/25/2019 COT - RSPL - Gas Pressure Test Passed {Activity date: 10/25/2019; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - Clear Southwest Gas.}
11/01/2019 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 11/01/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - RVI} ; {Activity date: 10/31/2019; Status: Not ready for Inspection; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - THIS IS THE THIRD TIME THIS RE-INSPECTION HAS BEEN CALLED AND IS NOT READY. A RE-INSPECTION FEE OF $82.50 HAS BEEN ADDED BY BSTEVENS.} ; {Activity date: 10/25/2019; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - Provide DWV Test on plumbing top out, and Potable water test on water lines. Provide 10’ Clearance from Fresh air intake and Plumbing Vent.}
11/14/2019 COT - HCBU - Interior Shear Bracing Passed {Activity date: 11/14/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - (RVI)}
12/11/2019 COT - BULD - SWG Clearance Passed {Activity date: 12/11/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by DMERANZ1 - RESEND} ; {Activity date: 10/25/2019; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - }

Documents

File Name Document Type  
PT REPORT LOT 96.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
None CONSTRPLANS VIEW