Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 11/01/2019 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
BSTEVENS |
Approved |
Entered by BSTEVENS - RVI |
| 10/31/2019 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
BSTEVENS |
Not ready for Inspection |
Entered by BSTEVENS - THIS IS THE THIRD TIME THIS RE-INSPECTION HAS BEEN CALLED AND IS NOT READY. A RE-INSPECTION FEE OF $82.50 HAS BEEN ADDED BY BSTEVENS. |
| 10/25/2019 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
DMUNIZ |
Not ready for Inspection |
Entered by DMERANZ1 - Provide DWV Test on plumbing top out, and Potable water test on water lines. Provide 10’ Clearance from Fresh air intake and Plumbing Vent. |