Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T19CM03880
Permit Details
Apply Date:
05/31/2019
Applicant:
Huna Hammond
Description:
ATTACHED ADDITION AND RENOVATIONS: ENTRY WAY, MASTER BATHROOM, CLOSET WITH LAUNDRY REPAIR DUCTWORK
Permit Reviews
Permit Number - T19CM03880
Permit Status: Issued
Permit Description: ATTACHED ADDITION AND RENOVATIONS: ENTRY WAY, MASTER BATHROOM, CLOSET WITH LAUNDRY REPAIR DUCTWORK
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/31/2019 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 06/03/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM03880
Permit Status: Issued
Permit Description: ATTACHED ADDITION AND RENOVATIONS: ENTRY WAY, MASTER BATHROOM, CLOSET WITH LAUNDRY REPAIR DUCTWORK
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
05/31/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T19CM03880
Permite Description: ATTACHED ADDITION AND RENOVATIONS: ENTRY WAY, MASTER BATHROOM, CLOSET WITH LAUNDRY REPAIR DUCTWORK
Total Outstanding Inspections - 11
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSEL - Grounding/Bonding | N/A | Not Ready | |
10/27/2022 | COT - RSME - Mechanical Final | N/A | Not Ready | |
10/27/2022 | RSBU - Building Final | N/A | Not Ready | |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
10/26/2022 | COT - RSEL - Service Upgrade | N/A | Not Ready | |
10/27/2022 | RSME - Mechanical Progress | N/A | Not Ready | |
10/26/2022 | COT - RSPL - Gas Pressure Test | N/A | Not Ready | |
10/26/2022 | RSBU - Building Progress | N/A | Not Ready | |
10/27/2022 | COT - RSEL - Electrical Final | N/A | Not Ready | |
10/26/2022 | COT - RSEL - Electrical Underground | N/A | Not Ready | |
10/27/2022 | COT - LCBU - Framing | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T19CM03880
Permit Description: ATTACHED ADDITION AND RENOVATIONS: ENTRY WAY, MASTER BATHROOM, CLOSET WITH LAUNDRY REPAIR DUCTWORK
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/09/2020 | COT - RSPL - Rough Soil | Passed | {Activity date: 03/09/2020; Status: Approved; Inspector: ESTEVENS; Comment: Entered by DMERANZ1 - } ; {Activity date: 03/03/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by SFLORES2 - } ; {Activity date: 02/27/2020; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by SFLORES2 - not complete.} | |
04/07/2020 | COT - RSBU - Preslab | Passed | {Activity date: 04/07/2020; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - RVI} ; {Activity date: 03/09/2020; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by DMERANZ1 - not complete.} ; {Activity date: 03/03/2020; Status: Denied; Inspector: TVALENCIA; Comment: Entered by SFLORES2 - 1- Shall use the approved Solvent Cement for ABS material. 2- Shall provide a vent for the water closet or vent under the horizontal wet vent requirements. 3- Shall provide a water head test minimum of 5 feet above the highest fitting} ; {Activity date: 02/27/2020; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by SFLORES2 - not complete.} |
|
04/07/2020 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 04/07/2020; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - RVI} | |
07/06/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 07/06/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved, okay for dry-in } |
|
04/04/2024 | COT - LCBU - Framing | Passed | 4/4/24: passed | |
04/04/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
04/29/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections were made. 4/29/2024 |