Permit: T19CM03865
Permit Details
Status:
L of c
Type:
COMMERCIAL ALTERATION
Address:
4809 E SPEEDWAY BL
Address NEW:
4809 E SPEEDWAY BL
Apply Date:
05/31/2019
Applicant:
WATSON, JAMES RICHARD
Description:
PARTIAL INTERIOR DEMO AND FIRE DAMAGE REPAIR
Architects:
- WATSON, JAMES RICHARD
Contractors:
- KUSTOM US INC
Permit Reviews
Permit Number - T19CM03865
Permit Status: L of c
Permit Description: PARTIAL INTERIOR DEMO AND FIRE DAMAGE REPAIR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/16/2020 | REVISION - - 2ND | 01/16/2020 | COMPLETED |
| 05/31/2019 | COMMERCIAL - TI | 05/31/2019 | COMPLETED |
| 12/13/2019 | REVISION - - 1ST | 01/16/2020 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM03865
Permit Status: L of c
Permit Description: PARTIAL INTERIOR DEMO AND FIRE DAMAGE REPAIR
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 05/31/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: L of c
Permit Number: T19CM03865
Permit Description: PARTIAL INTERIOR DEMO AND FIRE DAMAGE REPAIR
Total Completed Inspections - 30
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/11/2019 | TEP CLEARANCE - PM | ESTEVENS | Approved | ADRESSES 4809 E SPEEDWAY BL AND 4817 E SPEEDWAY BL CODE RECN |
| 10/11/2019 | ELECTRIC - TEMPORARY SERVICE | ESTEVENS | Approved | DENIED (NOT READY) FOR ADDRESSES 4815 AND 4813. APPROVED FOR ADDRESSES 4809 AND 4817 The TEP clearance code is RECN. |
| 12/13/2019 | PLUMBING - FINAL | RSHERRY | Approved | WATER DISINFECTION REPORT REQUIRED |
| 12/13/2019 | MECHANICAL - FINAL | RSHERRY | Approved | AIR BALANCE REPORT REQUIRED |
| 01/16/2020 | OUTDOOR LIGHTING FINAL | RCHANDLER | Approved | |
| 01/16/2020 | ELECTRIC - OUTDOOR LIGHTING | RCHANDLER | Approved | |
| 01/16/2020 | ELECTRIC - PROGRESS | RCHANDLER | Approved | |
| 01/16/2020 | ELECTRIC - UNDERGROUND | RCHANDLER | Approved | |
| 01/16/2020 | ELECTRIC - UFER | RCHANDLER | Approved | |
| 01/16/2020 | ELECTRIC - CONSTRUCTION POWER | RCHANDLER | Approved | Previously approved. |
| 02/20/2020 | ROOF NAILING | RCHANDLER | Approved | |
| 04/09/2020 | FRAMING | TTREMBULAK | Approved | RVI OK to one-side drywall and one/strip along n/s girder above (draft stops installed). |
| 04/09/2020 | FRAMING | TTREMBULAK | Approved | RVI OK to one-side drywall and one/strip along n/s girder above (draft stops installed). |
| 04/09/2020 | FRAMING | TTREMBULAK | Approved | RVI OK to one-side drywall and one/strip along n/s girder above (draft stops installed). |
| 04/09/2020 | FRAMING | TTREMBULAK | Approved | RVI OK to one-side drywall and one/strip along n/s girder above (draft stops installed). |
| 04/22/2020 | PLUMBING - INTERMEDIATE | DMUNIZ | Approved | |
| 04/30/2020 | MECHANICAL - ABOVE CEILING | DMUNIZ | Approved | |
| 04/30/2020 | ELECTRIC - ABOVE CEILING | DMUNIZ | Approved | |
| 04/30/2020 | BUILDING ABOVE CEILING | DMUNIZ | Approved | |
| 05/01/2020 | ELECTRIC - INTERMEDIATE | DMUNIZ | Approved | |
| 05/06/2020 | MECHANICAL - INTERMEDIATE | TTREMBULAK | Approved | RVI |
| 05/22/2020 | SHEET ROCK NAILING | BSTEVENS | Approved | ALL DRYWALL OK TO COVER |
| 05/26/2020 | ELECTRIC - SERVICE UPGRADE | DMUNIZ | Approved | Clear TEP INCR |
| 07/20/2020 | ELECTRIC - FINAL | TTREMBULAK | Approved | Approved |
| 07/21/2020 | ENGINEERING - FINAL | DROBERTS | Approved | IS APPROVED |
| 07/27/2020 | FIRE - FINAL | gdauria | Approved | |
| 08/07/2020 | BUILDING - FINAL | TTREMBULAK | Approved | Approved |
| 08/07/2020 | BUILDING - FINAL | TTREMBULAK | Approved | Approved |
| 08/07/2020 | BUILDING - FINAL | TTREMBULAK | Approved | Approved |
| 08/07/2020 | BUILDING - FINAL | TTREMBULAK | Approved | Approved |