Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 04/09/2020 |
FRAMING |
|
Approved |
RVI OK to one-side drywall and one/strip along n/s girder above (draft stops installed). |
| 04/09/2020 |
FRAMING |
|
Approved |
RVI OK to one-side drywall and one/strip along n/s girder above (draft stops installed). |
| 04/09/2020 |
FRAMING |
|
Approved |
RVI OK to one-side drywall and one/strip along n/s girder above (draft stops installed). |
| 04/09/2020 |
FRAMING |
|
Approved |
RVI OK to one-side drywall and one/strip along n/s girder above (draft stops installed). |
| 04/08/2020 |
FRAMING |
|
Cancelled |
IVRS - AP canceled |
| 02/20/2020 |
FRAMING |
|
Partial Approval |
Reschedule with intermediates to verify integrity of current framing after trade work is completed. |
| 02/18/2020 |
FRAMING |
|
Cancelled |
IVRS - AP canceled |
| 01/16/2020 |
FRAMING |
|
Not Applicable |
|