Permit: T19CM03849
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
5161 S FREMONT DR
Address NEW:
5161 S FREMONT DR
Apply Date:
05/30/2019
Applicant:
Maria Celaya
Description:
REV1: change of location for the mini split HVAC units; updated electrical load ATTACHED STUDIO
Permit Reviews
Permit Number - T19CM03849
Permit Status: Inspections
Permit Description: REV1: change of location for the mini split HVAC units; updated electrical load
ATTACHED STUDIO
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/30/2019 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 07/26/2019 | COMPLETED |
| 07/26/2019 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 07/26/2019 | COMPLETED |
| 06/25/2026 | RESIDENTIAL ADD/ALT SIMPLE REVIEW REVISION v.1 | 06/26/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - T19CM03849
Permit Status: Inspections
Permit Description: REV1: change of location for the mini split HVAC units; updated electrical load
ATTACHED STUDIO
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 05/30/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: T19CM03849
Permite Description: REV1: change of location for the mini split HVAC units; updated electrical load
ATTACHED STUDIO
Total Outstanding Inspections - 10
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - RSME - Mechanical Final | N/A | Not Ready | |
| 10/27/2022 | RSBU - Building Final | N/A | Not Ready | |
| 10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
| 10/27/2022 | COT - RSEL - Electrical Final | N/A | Not Ready | |
| 10/26/2022 | COT - RSBU - Preslab | N/A | Not Ready | |
| 11/15/2024 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 11/15/24: roof sheathing not fastened per schedule. |
| 07/28/2025 | COT - LCBU - Framing | N/A | Re-inspection required | 7/28/2025 provide 2 layers of vapor barrier per t1-11. |
| 10/26/2022 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Not Ready | |
| 07/28/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | Install line sets for mini splits. Fire foam all top penetrations for electrical lines. Seal all exterior penetrations. Receptacle over sink area needs to be moved over. Water distribution not per code and near both electrical panels. Secure conduit risers at both ends. 7/28/2025 |
| 10/27/2022 | RSME - Mechanical Progress | N/A | Not Ready |
Completed Inspections
Permit Status: Inspections
Permit Number: T19CM03849
Permit Description: REV1: change of location for the mini split HVAC units; updated electrical load
ATTACHED STUDIO
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2019 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 11/04/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/22/2019; Status: Not ready for Inspection; Inspector: TVALENCIA; Comment: Entered by KROBLES1 - 1- Shall expose the post footings for verification of depth and width of existing post footings.} | |
| 09/20/2021 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/21/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, okay to backfill} ; {Activity date: 08/18/2021; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - NR, must reschedule} | |
| 11/15/2024 | COT - RSBU - Preslab | Passed | 11/15/24: passed by TVALENCIA | |
| 04/09/2026 | COT - RSBU - Roof Nailing | Passed | 04/09/2026 Verified roof nail schedule. |
|
| 04/09/2026 | COT - LCBU - Framing | Passed | 04/09/2026 Corrections made to prior inspections, verified hangers, anchor bolts and shot pins per schedule. |
|
| 04/09/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 04/09/2026 Corrections made to prior inspections, verified hangers, anchor bolts and shot pins per schedule. |
|
| 06/30/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/30/2026 | RSME - Mechanical Progress | Passed |