Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address NEW:
5161 S FREMONT DR
Apply Date:
05/30/2019
Applicant:
Maria Celaya
Description:
REV1: change of location for the mini split HVAC units; updated electrical load ATTACHED STUDIO

Permit Reviews

Permit Number - T19CM03849
Permit Status: Inspections
Permit Description: REV1: change of location for the mini split HVAC units; updated electrical load ATTACHED STUDIO
Start Date Submittal Complete Date Status  
05/30/2019 RESIDENTIAL - BLDG/ZONING-WALKTHRU 07/26/2019 COMPLETED Review Details
07/26/2019 RESIDENTIAL - BLDG/ZONING-WALKTHRU 07/26/2019 COMPLETED Review Details
06/25/2026 RESIDENTIAL ADD/ALT SIMPLE REVIEW REVISION v.1 06/26/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T19CM03849
Permit Status: Inspections
Permit Description: REV1: change of location for the mini split HVAC units; updated electrical load ATTACHED STUDIO
Total Outstanding Activity Conditions - 1
Date Name
05/30/2019 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Outstanding Inspections

Permit Status: Inspections
Permit Number: T19CM03849
Permite Description: REV1: change of location for the mini split HVAC units; updated electrical load ATTACHED STUDIO
Total Outstanding Inspections - 10
Last Inspection Date Description Inspector Results Comments
10/27/2022 COT - RSME - Mechanical Final N/A Not Ready
10/27/2022 RSBU - Building Final N/A Not Ready
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready
10/27/2022 COT - RSEL - Electrical Final N/A Not Ready
10/26/2022 COT - RSBU - Preslab N/A Not Ready
11/15/2024 COT - RSBU - Roof Nailing N/A Re-inspection required 11/15/24: roof sheathing not fastened per schedule.
07/28/2025 COT - LCBU - Framing N/A Re-inspection required 7/28/2025 provide 2 layers of vapor barrier per t1-11.
10/26/2022 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Not Ready
07/28/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required Install line sets for mini splits. Fire foam all top penetrations for electrical lines. Seal all exterior penetrations. Receptacle over sink area needs to be moved over. Water distribution not per code and near both electrical panels. Secure conduit risers at both ends. 7/28/2025
10/27/2022 RSME - Mechanical Progress N/A Not Ready

Completed Inspections

Permit Status: Inspections
Permit Number: T19CM03849
Permit Description: REV1: change of location for the mini split HVAC units; updated electrical load ATTACHED STUDIO
Total Completed Inspections - 8
Date Description Inspector Results Comments
11/04/2019 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 11/04/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/22/2019; Status: Not ready for Inspection; Inspector: TVALENCIA; Comment: Entered by KROBLES1 - 1- Shall expose the post footings for verification of depth and width of existing post footings.}
09/20/2021 COT - RSPL - Rough Soil Passed {Activity date: 09/21/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, okay to backfill} ; {Activity date: 08/18/2021; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - NR, must reschedule}
11/15/2024 COT - RSBU - Preslab Passed 11/15/24: passed by TVALENCIA
04/09/2026 COT - RSBU - Roof Nailing Passed 04/09/2026
Verified roof nail schedule.
04/09/2026 COT - LCBU - Framing Passed 04/09/2026
Corrections made to prior inspections, verified hangers, anchor bolts and shot pins per schedule.
04/09/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 04/09/2026
Corrections made to prior inspections, verified hangers, anchor bolts and shot pins per schedule.
06/30/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/30/2026 RSME - Mechanical Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
1_COMMENT LETTER T19CM03849_V1.PDF DOCUMENTS VIEW
CONS-REV_PLAN SET_T19CM03849 MARIA CELAYA_5161 S FREMONT DR_V1.PDF DOCUMENTS VIEW
001_SHEET 1.TIF CONSTRPLANS VIEW
002_SHEET 2.TIF CONSTRPLANS VIEW
003_SHEET 3.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW