Inspection Status: Not Ready
Inspection History: COT - LCBU - Framing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - LCBU - Framing | Not Ready | ||
| 04/09/2026 | COT - LCBU - Framing | Passed | 04/09/2026 Corrections made to prior inspections, verified hangers, anchor bolts and shot pins per schedule. |
|
| 07/28/2025 | COT - LCBU - Framing | Re-inspection required | 7/28/2025 provide 2 layers of vapor barrier per t1-11. | |
| 11/15/2024 | COT - LCBU - Framing | Re-inspection required | 11/15/24: Anchor bolt spacing greater than 32" o.c throughout, anchor bolts required 12" from edge of sill plate, shot pins required 6" from edge of sill plate. Shot pins required 48" o.c, damaged roof joist must be replaced, anchor bolts at ledger required per plan. | |
| 11/22/2024 | COT - LCBU - Framing | Partial Pass | 11/15/24: Anchor bolt spacing greater than 32" o.c throughout, anchor bolts required 12" from edge of sill plate, shot pins required 6" from edge of sill plate. Shot pins required 48" o.c, damaged roof joist must be replaced, anchor bolts at ledger required per plan. 11/22/24: partial pass for roof ok to proceed with drying-in. Anchor bolts must be properly fastened (will check at intermediate), hangers must be properly installed ( removed to show anchor bolts at ledger). |