Permit: T19CM03787
Permit Details
Status:
Issued
Type:
Commercial Building
Address:
530 S PANTANO RD 03
Address NEW:
530 S PANTANO RD 03
Apply Date:
05/29/2019
Applicant:
Description:
TI: WASH ROOMS TO EXISITING BUILDING
Permit Reviews
Permit Number - T19CM03787
Permit Status: Issued
Permit Description: TI: WASH ROOMS TO EXISITING BUILDING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/29/2019 | COMMERCIAL - TI | 06/26/2019 | COMPLETED |
| 05/25/2023 | COMMERCIAL REVIEW - FULL v.1 | 06/28/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T19CM03787
Permit Status: Issued
Permit Description: TI: WASH ROOMS TO EXISITING BUILDING
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 05/29/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T19CM03787
Permite Description: TI: WASH ROOMS TO EXISITING BUILDING
Total Outstanding Inspections - 18
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/17/2022 | ENGR Engineering Final | N/A | Complete (Recurring) | {Activity date: 05/17/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN CONTRACTOR NOT ON SITE.NEEDTO RESCHEDULE. } |
| 10/26/2022 | COT - LCBU - Building Above Ceiling | N/A | Not Ready | |
| 10/26/2022 | COT - LCME - Mechanical Above Ceiling | N/A | Not Ready | |
| 10/26/2022 | COT - LCEL - Electrical Above Ceiling | N/A | Not Ready | |
| 10/26/2022 | COT - LCME - Mechanical Intermediate | N/A | Not Ready | |
| 10/26/2022 | COT - LCBU - Building Progress | N/A | Not Ready | |
| 10/27/2022 | COT - LCBU - Building Final | N/A | Not Ready | |
| 10/27/2022 | COT - LCEL - Electrical Final | N/A | Not Ready | |
| 10/26/2022 | COT - LCPL - Plumbing Final | N/A | Not Ready | |
| 10/26/2022 | COT - FCON - Fire - Final | N/A | Not Ready | |
| 05/05/2023 | COT - LCBU - Preslab | N/A | Not Ready | The name and number in notes was called and Alex said he had no connection to this property. 4/28/23: called Glenn Hamm @ 520-240-9939 as given in notes. Number is not in service. 5/5/23: not ready |
| 05/10/2023 | COT - LCBU - Framing | N/A | Canceled | |
| 05/10/2023 | COT - HCPL - Rough Soil | N/A | Partial Pass | 5/5/23: revise sealed plans of new location and size of new soil pipe for bathroom. Submit for new review before final inspection. The next soil inspection can be done with new revised plans sealed by the Engineer. 5/10/23: soil in room 106 to sewer tie-in approved. |
| 05/10/2023 | COT - HCBU - Framing | N/A | Partial Pass | 5/10/23: bathroom framing at room 106 approved. |
| 05/16/2023 | COT - LCEL - Electrical Intermediate | N/A | Re-inspection required | 5-16-23: Ground metal light in box. |
| 05/16/2023 | COT - LCPL - Plumbing Intermediate | N/A | Re-inspection required | 5-16-23: 1-Need 18" of copper, before transitioning to per at W/H. 2-Nail plate needed at base of stack. 3-Provide test on piping. |
| 10/26/2022 | COT - LCME - Mechanical Final | N/A | Not Ready | |
| 10/26/2022 | COT - FCON - Alarm - Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T19CM03787
Permit Description: TI: WASH ROOMS TO EXISITING BUILDING
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2019 | COT - LCPL - Rough Soil | Passed | {Activity date: 07/15/2019; Status: Approved; Inspector: GWEST; Comment: Entered by DMERANZ1 - Plumbing rough soil, Approved Outdoor, tracer wire, CO, for sewer lateral.} |
|
| 08/05/2019 | COT - LCPL - Gas Pressure Test | Passed | {Activity date: 08/05/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - } | |
| 05/18/2023 | COT - LCEL - Electrical Intermediate | Passed | ||
| 05/18/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 07/06/2023 | COT - FCON - Alarm - Final | Passed | ||
| 08/02/2023 | COT - HCBU - Building Final | Passed |