Permit Details

Status:
Issued
Type:
Commercial Building
Address NEW:
530 S PANTANO RD 03
Apply Date:
05/29/2019
Applicant:
Description:
TI: WASH ROOMS TO EXISITING BUILDING

Permit Reviews

Permit Number - T19CM03787
Permit Status: Issued
Permit Description: TI: WASH ROOMS TO EXISITING BUILDING
Start Date Submittal Complete Date Status  
05/29/2019 COMMERCIAL - TI 06/26/2019 COMPLETED Review Details
05/25/2023 COMMERCIAL REVIEW - FULL v.1 06/28/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T19CM03787
Permit Status: Issued
Permit Description: TI: WASH ROOMS TO EXISITING BUILDING
Total Outstanding Activity Conditions - 1
Date Name
05/29/2019 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Outstanding Inspections

Permit Status: Issued
Permit Number: T19CM03787
Permite Description: TI: WASH ROOMS TO EXISITING BUILDING
Total Outstanding Inspections - 18
Last Inspection Date Description Inspector Results Comments
05/17/2022 ENGR Engineering Final N/A Complete (Recurring) {Activity date: 05/17/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN CONTRACTOR NOT ON SITE.NEEDTO RESCHEDULE.

}
10/26/2022 COT - LCBU - Building Above Ceiling N/A Not Ready
10/26/2022 COT - LCME - Mechanical Above Ceiling N/A Not Ready
10/26/2022 COT - LCEL - Electrical Above Ceiling N/A Not Ready
10/26/2022 COT - LCME - Mechanical Intermediate N/A Not Ready
10/26/2022 COT - LCBU - Building Progress N/A Not Ready
10/27/2022 COT - LCBU - Building Final N/A Not Ready
10/27/2022 COT - LCEL - Electrical Final N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready
10/26/2022 COT - FCON - Fire - Final N/A Not Ready
05/05/2023 COT - LCBU - Preslab N/A Not Ready The name and number in notes was called and Alex said he had no connection to this property.
4/28/23: called Glenn Hamm @ 520-240-9939 as given in notes. Number is not in service.

5/5/23: not ready
05/10/2023 COT - LCBU - Framing N/A Canceled
05/10/2023 COT - HCPL - Rough Soil N/A Partial Pass 5/5/23: revise sealed plans of new location and size of new soil pipe for bathroom. Submit for new review before final inspection. The next soil inspection can be done with new revised plans sealed by the Engineer.
5/10/23: soil in room 106 to sewer tie-in approved.
05/10/2023 COT - HCBU - Framing N/A Partial Pass 5/10/23: bathroom framing at room 106 approved.
05/16/2023 COT - LCEL - Electrical Intermediate N/A Re-inspection required 5-16-23: Ground metal light in box.
05/16/2023 COT - LCPL - Plumbing Intermediate N/A Re-inspection required 5-16-23: 1-Need 18" of copper, before transitioning to per at W/H. 2-Nail plate needed at base of stack. 3-Provide test on piping.
10/26/2022 COT - LCME - Mechanical Final N/A Not Ready
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T19CM03787
Permit Description: TI: WASH ROOMS TO EXISITING BUILDING
Total Completed Inspections - 6
Date Description Inspector Results Comments
07/15/2019 COT - LCPL - Rough Soil Passed {Activity date: 07/15/2019; Status: Approved; Inspector: GWEST; Comment: Entered by DMERANZ1 - Plumbing rough soil, Approved
Outdoor, tracer wire, CO, for sewer lateral.}
08/05/2019 COT - LCPL - Gas Pressure Test Passed {Activity date: 08/05/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - }
05/18/2023 COT - LCEL - Electrical Intermediate Passed
05/18/2023 COT - LCPL - Plumbing Intermediate Passed
07/06/2023 COT - FCON - Alarm - Final Passed
08/02/2023 COT - HCBU - Building Final Passed

Documents

File Name Document Type  
CHRIST COMMUNITY CHURCH_V1.PDF DOCUMENTS VIEW
CONS-19104P-3-P1_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
001_C.1.TIF CONSTRPLANS VIEW
002_C.2.TIF CONSTRPLANS VIEW
003_C.3.TIF CONSTRPLANS VIEW
004_C.4.TIF CONSTRPLANS VIEW
005_C.5.TIF CONSTRPLANS VIEW
006_C.6.TIF CONSTRPLANS VIEW
007_A.1.TIF CONSTRPLANS VIEW
008_A.2.TIF CONSTRPLANS VIEW
009_A.3.TIF CONSTRPLANS VIEW
010_A.4.TIF CONSTRPLANS VIEW
011_A.5.TIF CONSTRPLANS VIEW
012_A.6.TIF CONSTRPLANS VIEW
013_M.1.TIF CONSTRPLANS VIEW
014_P.0.TIF CONSTRPLANS VIEW
015_P.1.TIF CONSTRPLANS VIEW
016_P.2.TIF CONSTRPLANS VIEW
017_P.3.TIF CONSTRPLANS VIEW
018_P.4.TIF CONSTRPLANS VIEW
019_E.1.TIF CONSTRPLANS VIEW
020_E.2.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW