Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - HCPL - Rough Soil
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/05/2023 | COT - HCPL - Rough Soil | Re-inspection required | 5/5/23: revise sealed plans of new location and size of new soil pipe for bathroom. Submit for new review before final inspection. The next soil inspection can be done with new revised plans sealed by the Engineer. | |
| 05/10/2023 | COT - HCPL - Rough Soil | Partial Pass | 5/5/23: revise sealed plans of new location and size of new soil pipe for bathroom. Submit for new review before final inspection. The next soil inspection can be done with new revised plans sealed by the Engineer. 5/10/23: soil in room 106 to sewer tie-in approved. |