Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
C of o
Type:
COMMERCIAL NEW
Address:
6295 E 22ND ST
Address NEW:
6295 E 22ND ST
Apply Date:
05/17/2019
Applicant:
N/A
Description:
E - NEW DRIVE THROUGH COFFEE SHOP
Contractors:
  • STOUT DEVELOPMENT

Permit Reviews

Permit Number - T19CM03510
Permit Status: C of o
Permit Description: E - NEW DRIVE THROUGH COFFEE SHOP
Start Date Submittal Complete Date Status  
02/27/2020 REVISION - - 1ST 03/10/2020 COMPLETED Review Details
05/07/2019 PLANS OK TO SUBMIT - COMM 05/22/2019 COMPLETED Review Details
05/30/2019 COMMERCIAL - NEW 08/09/2019 COMPLETED Review Details
08/09/2019 RESUBMITTAL 09/24/2019 COMPLETED Review Details
09/24/2019 RESUBMITTAL 10/23/2019 COMPLETED Review Details
10/23/2019 RESUBMITTAL 11/04/2019 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T19CM03510
Permit Status: C of o
Permit Description: E - NEW DRIVE THROUGH COFFEE SHOP
Total Outstanding Activity Conditions - 1
Date Name
05/17/2019 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T19CM03510
Permit Description: E - NEW DRIVE THROUGH COFFEE SHOP
Total Completed Inspections - 35
Date Description Inspector Results Comments
08/19/2019 PLUMBING - FINAL RSHERRY Approved WATER DISINFECTION REPORT REQUIRED
01/28/2020 ELECTRIC - UFER WGALLAG1 Approved
02/06/2020 STEM WALL/RETAINING WALL WGALLAG1 Approved
02/11/2020 PLUMBING - ROUGH, SOIL WGALLAG1 Approved
02/14/2020 BUILDING PRE-SLAB DMUNIZ Approved
02/21/2020 ROOF NAILING MRAMBER Approved
02/21/2020 EXT METAL CLIPS/EXT SHEATHING MRAMBER Approved
03/11/2020 MECHANICAL - INTERMEDIATE RCHANDLER Approved
03/11/2020 ELECTRIC - INTERMEDIATE RCHANDLER Approved
03/16/2020 PLUMBING - INTERMEDIATE MRAMBER Approved
03/16/2020 FRAMING MRAMBER Approved
03/26/2020 PLUMBING - YARD WTR LINE/TEST RCHANDLERE Approved RVI
03/26/2020 PLUMBING - SEWER HCS CONNECT RCHANDLERE Approved RVI
04/13/2020 ELECTRIC - UNDERGROUND DMUNIZ Approved Conduit sweeps for new light poles and and connection to Existing poles ok to backfill.
04/13/2020 EXCAVATION/LAYOUT REBAR & ZON DMUNIZ Approved Case ons for 4 new light poles ok for concrete.
04/16/2020 TEP CLEARANCE - PM WGALLAGHER Approved CODE ECO
04/16/2020 OUTDOOR LIGHTING FINAL WGALLAGHER Approved CODE ECO
04/16/2020 ELECTRIC - CONSTRUCTION POWER WGALLAGHER Approved Approved ok for clearance to energize switch
Clearance ECO
04/16/2020 ELECTRIC - ABOVE CEILING WGALLAGHER Approved
04/21/2020 STUCCO MESH TTREMBULAK Approved RVI
05/14/2020 ELECTRIC - OUTDOOR LIGHTING TTREMBULAK Approved
05/14/2020 ELECTRIC - FINAL TTREMBULAK Approved RVI
05/15/2020 FIRE - FINAL jvincent Approved
05/19/2020 MECHANICAL - FINAL RSHERRY Approved REVIEW OF AIR BALANCE REPORT COMPLETED
05/19/2020 MECHANICAL - FINAL WGALLAGHER Approved Partial approval awaiting air balance report approval
05/20/2020 ELECTRIC - TEMPORARY SERVICE WGALLAGHER Approved Not required
05/20/2020 U VALUE FOR WINDOW WGALLAGHER Approved
05/20/2020 BUILDING - PROGRESS WGALLAGHER Approved
05/20/2020 BUILDING ABOVE CEILING WGALLAGHER Approved
05/20/2020 REINFORCED MASONRY PRE-GROUT WGALLAGHER Approved Not required
Completed on DP19-0110
06/01/2020 ENGINEERING - FINAL RLEDONNE Approved
06/23/2020 CERTIFICATE OF OCCUPANCY DMUNIZ Approved Approved, Water Disinfection report submitted for approval.
06/23/2020 PLUMBING - ROOF DRAINS DMUNIZ Approved Approved, Water Disinfection report submitted for approval.
07/17/2020 HEALTH DEPT - FINAL 724-7908 CSHETTER Approved
07/28/2020 BUILDING - FINAL JG3 Approved

Documents

File Name Document Type  
CERTIFICATION LETTER1.PDF DOCUMENTS VIEW
COFO1.PDF DOCUMENTS VIEW
HEALTH DEPARTMENT FINAL INSPECTION1.PDF DOCUMENTS VIEW
HEALTH DEPT1.PDF DOCUMENTS VIEW
REV1_ASPHALT TEST REPORT1.PDF DOCUMENTS VIEW
REV1_CONCRETE TEST REPORT1.PDF DOCUMENTS VIEW
REV1_DAILY FIELD REPORT1.PDF DOCUMENTS VIEW
REV1_FIELD DENSITY TEST REPORT_0733151-121.PDF DOCUMENTS VIEW
REV1_FIELD DENSITY TEST REPORT_0733151-131.PDF DOCUMENTS VIEW
REV1_FIELD DENSITY TEST REPORT_0733151-51.PDF DOCUMENTS VIEW
REV1_MATERIAL TEST REPORT1.PDF DOCUMENTS VIEW
REV1_PROCTOR REPORT1.PDF DOCUMENTS VIEW
REV1_REINFORCING STEEL OBSERVATION REPORT1.PDF DOCUMENTS VIEW
REV1_SPECIAL INSPECTION DAILY FIELD REPORT1.PDF DOCUMENTS VIEW
REV2_CONCRETE TEST REPORT1.PDF DOCUMENTS VIEW
SIC1.PDF DOCUMENTS VIEW
T19CM03510 AIR BALANCE.PDF DOCUMENTS VIEW
T19CM03510 WATER REPORT.PDF DOCUMENTS VIEW
REV-1_TRUSSES.PDF DOCUMENTS VIEW
4_PLAN_SET 10.21.19.PDF CONSTRPLANS VIEW
2_PLAN_SET.PDF CONSTRPLANS VIEW
1_ALTA_SURVEY 04.15.19.PDF DOCUMENTS VIEW
1_SOILS_REPORT 04.15.19.PDF DOCUMENTS VIEW
3_STRUCTURAL_CALCS 09.16.19.PDF DOCUMENTS VIEW
4_COMPLIANCE CERT 10.21.19.PDF DOCUMENTS VIEW
4_SPECIAL INSPECTION 09.23.2019 SIGNED.PDF DOCUMENTS VIEW
APPLICATION_05.07.19.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
BOND EXCEPT.PDF DOCUMENTS VIEW
LETTER HEAD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
2_SECTION 8_ SOLID WASTE FIGURE 2 (CORRECTED 06.28.19).PDF DOCUMENTS VIEW
2_SECTION 8_ SOLID WASTE FIGURE 3B (CORRECTED 06.28.19).PDF DOCUMENTS VIEW