Inspection Status: Approved
Inspection History: ELECTRIC - UNDERGROUND
| Date |
Description |
Inspector |
Results |
Comments |
| 04/13/2020 |
ELECTRIC - UNDERGROUND |
|
Approved |
Conduit sweeps for new light poles and and connection to Existing poles ok to backfill. |
| 02/28/2020 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
Electrical Conduits for 2 new light poles on North side and to Existing west side light pole. Also Conduits to Building for line voltage and low voltage all ok to backfill. |
| 01/21/2020 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
Contractor stated inspection was done on 1/18 with Ernie. |
| 01/17/2020 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
IVR. From Transformer to building SES. From SES into the building. |
| 01/16/2020 |
ELECTRIC - UNDERGROUND |
|
Denied |
At site, no access. Gate locked. Arrived 4:00 |