Permit: T19CM02427
Permit Details
Apply Date:
04/08/2019
Applicant:
JAZMINE HINOJOSA
Description:
ADD PORCH, CARPORT, AND STORAGE
Permit Reviews
Permit Number - T19CM02427
Permit Status: Final
Permit Description: ADD PORCH, CARPORT, AND STORAGE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/08/2019 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 07/18/2019 | COMPLETED |
| 07/18/2019 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 07/18/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM02427
Permit Status: Final
Permit Description: ADD PORCH, CARPORT, AND STORAGE
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 04/08/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T19CM02427
Permit Description: ADD PORCH, CARPORT, AND STORAGE
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/27/2019 | ELECTRIC - FINAL | AKLEINSORGE | Approved | |
| 08/27/2019 | ELECTRIC - INTERMEDIATE | AKLEINSORGE | Approved | |
| 08/27/2019 | BUILDING - FINAL | AKLEINSORGE | Approved | |
| 08/27/2019 | FRAMING | AKLEINSORGE | Approved | Verified through pictures provided by homeowner, work was already completed when inspections were called in |
| 08/27/2019 | ROOF NAILING | AKLEINSORGE | Approved | Not applicable to this permit |
| 08/27/2019 | EXT METAL CLIPS/EXT SHEATHING | AKLEINSORGE | Approved | Verified through pictures provided by homeowner, work was already completed when inspections were called in |
| 08/27/2019 | STEM WALL/RETAINING WALL | AKLEINSORGE | Approved | Not applicable to this permit |
| 08/27/2019 | EXCAVATION/LAYOUT REBAR & ZON | AKLEINSORGE | Approved | Verified through pictures provided by homeowner, work was already completed when inspections were called in |
| 08/27/2019 | FIREWALL/FIREBARRIER/FIRESTOP | AKLEINSORGE | Approved | Verified through pictures provided by homeowner, work was already completed when inspections were called in. Note: No drywall installed inside new storage room at inspection, revise drawings to show this or finish per plan |