Permit: T19CM00216
Permit Details
Status:
Expired
Type:
Residential Building - One or Two Family
Address:
3714 S LUNDY AV
Address NEW:
3714 S LUNDY AV
Apply Date:
01/11/2019
Applicant:
Description:
ADD BEDROOM AND BATHROOM
Permit Reviews
Permit Number - T19CM00216
Permit Status: Expired
Permit Description: ADD BEDROOM AND BATHROOM
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/11/2019 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 01/11/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM00216
Permit Status: Expired
Permit Description: ADD BEDROOM AND BATHROOM
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 01/11/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T19CM00216
Permite Description: ADD BEDROOM AND BATHROOM
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2022 | COT - RSME - Mechanical Final | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | RSBU - Building Final | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - RSPL - Plumbing Final | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - RSEL - Electrical Final | N/A | Canceled | Inspection Canceled |
Completed Inspections
Permit Status: Expired
Permit Number: T19CM00216
Permit Description: ADD BEDROOM AND BATHROOM
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/07/2019 | COT - RSPL - Rough Soil | Passed | {Activity date: 02/07/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by CBELL1 - add tracer wire to piping not under slab} | |
| 04/02/2019 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 04/02/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by CBELL1 - } | |
| 01/16/2020 | COT - RSBU - Roof Nailing | Passed | {Activity date: 01/16/2020; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } ; {Activity date: 07/30/2019; Status: Partial Approval; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - roof overhang is not per drawing and is 3 feet on south side of house which is now making it only 4 feet to the property line. 2 feet is maximum unless designed that way, also anything within 5 feet of property line will need a fire rating. There are still issues with the homemade trusses not being per drawing. Please revise drawings or build per drawing. Add anchors into bottom plate on south wall. Nails were added in the sheathing, however drywall screws are still in the sheathing. Either seal the screwheads so they will not rust through the stucco later or remove them leaving the correct amount of nailing per drawing. OK to cover roof with the exception that the overhang on southside will need to be addressed.} ; {Activity date: 06/25/2019; Status: Denied; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - Provide 2 x 8 ridge per plan Top plate splices at least 48” per note 7 Provide 8 D common nails 6” of at edges 12” in field per plywood note 3. Drywall screws may not be used Provide 3 hole bird board blocking for diaphragm nailing per detail 1 What is fix for splice at ridge board. Stopped inspection} |
|
| 01/16/2020 | COT - LCBU - Framing | Passed | {Activity date: 01/16/2020; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } ; {Activity date: 12/27/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1, No one home to provide access to the inspection area at the time of inspection request. 10:15 am.} | |
| 01/16/2020 | COT - RSBU - Preslab | Passed | {Activity date: 01/16/2020; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } | |
| 01/16/2020 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | {Activity date: 01/16/2020; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } ; {Activity date: 12/31/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- The approved plans call for H25 clips on each stud.} | |
| 01/28/2020 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 01/28/2020; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } |