Inspection Status: Passed
Inspection History: COT - RSBU - Roof Nailing
| Date |
Description |
Inspector |
Results |
Comments |
| 01/16/2020 |
COT - RSBU - Roof Nailing |
TVALENCIA |
Approved |
Entered by DMERANZ1 - |
| 07/30/2019 |
COT - RSBU - Roof Nailing |
MHASSAN |
Partial Approval |
Entered by DMERANZ1 - roof overhang is not per drawing and is 3 feet on south side of house which is now making it only 4 feet to the property line. 2 feet is maximum unless designed that way, also anything within 5 feet of property line will need a fire rating. There are still issues with the homemade trusses not being per drawing. Please revise drawings or build per drawing. Add anchors into bottom plate on south wall. Nails were added in the sheathing, however drywall screws are still in the sheathing. Either seal the screwheads so they will not rust through the stucco later or remove them leaving the correct amount of nailing per drawing. OK to cover roof with the exception that the overhang on southside will need to be addressed. |
| 06/25/2019 |
COT - RSBU - Roof Nailing |
RCAMACHO |
Denied |
Entered by DMERANZ1 - Provide 2 x 8 ridge per plan
Top plate splices at least 48” per note 7
Provide 8 D common nails 6” of at edges 12” in field per plywood note 3. Drywall screws may not be used
Provide 3 hole bird board blocking for diaphragm nailing per detail 1
What is fix for splice at ridge board.
Stopped inspection |