Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Final
Type:
Barricade Only
Address:
110 S CHURCH AV
Address NEW:
110 S CHURCH AV
Apply Date:
11/02/2018
Applicant:
TOFEL CONSTRUCTION LLC
Description:
Construction zone to be fenced off including parking and south bound lanes to be shifted to the east side of Church Ave 07/08/2019-PLAN CHANGE Beginning on the west side of S. Church Ave at the north side of current traffic control is set up (plan#18-2681) tie into existing chain link fencing heading north to the south side of Broadway Blvd (maintain ADA Ramps and sun link stop) then head west with closure ending at the east side of the stairs leading to the pedestrian bridge that crosses Broadway. Contractor to access existing underground electrical (estimated 5 WEEK portion of project) MR. ORTIZ STATED HE COULD COMPLETE WORK WITHIN 5 WEEKS AND SUNLINKS ALSO HAD A CONCERN W/THE 3 MONTH CLOSURE 06/19/2020 -pLAN CHANGE - R6 - add signage to construction site entrance-Construction Entrance Authorized personnel only

Outstanding Inspections

Permit Status: Final
Permit Number: T18RW04938
Permite Description: Construction zone to be fenced off including parking and south bound lanes to be shifted to the east side of Church Ave 07/08/2019-PLAN CHANGE Beginning on the west side of S. Church Ave at the north side of current traffic control is set up (plan#18-2681) tie into existing chain link fencing heading north to the south side of Broadway Blvd (maintain ADA Ramps and sun link stop) then head west with closure ending at the east side of the stairs leading to the pedestrian bridge that crosses Broadway. Contractor to access existing underground electrical (estimated 5 WEEK portion of project) MR. ORTIZ STATED HE COULD COMPLETE WORK WITHIN 5 WEEKS AND SUNLINKS ALSO HAD A CONCERN W/THE 3 MONTH CLOSURE 06/19/2020 -pLAN CHANGE - R6 - add signage to construction site entrance-Construction Entrance Authorized personnel only
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/27/2018 TDOT-EXCAV GENERAL INSPECTION N/A Continued asked them to fix some traffic control - CN