Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T18RW03168
Permit Details
Apply Date:
07/20/2018
Applicant:
ZAYO GROUP LLC
Description:
Excavate and install one 4x4x4 manhole and two 2x3x2 pullboxes. Bore approx. 2184 LF and install 3-1.25'' conduits and place fiber optic cable 2184 LF.
Contractors:
- TELCOM CONSTRUCTION INC
Completed Inspections
Permit Status: Final
Permit Number: T18RW03168
Permit Description: Excavate and install one 4x4x4 manhole and two 2x3x2 pullboxes. Bore approx. 2184 LF and install 3-1.25'' conduits and place fiber optic cable 2184 LF.
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/10/2018 | TDOT-EXCAV GENERAL INSPECTION | DR | Approved | Paving complete. Final. |