Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Expired
Type:
Fire Construction Permit
Apply Date:
05/02/2018
Applicant:
Description:
Automatic Fire Extingshing Sys - BLDG #3 - INSTALL NEW FIRE SPRINKLER SYSTEM; Commercial Fire Sprinkler Systems - Standpipe New Outlets: 4

Outstanding Inspections

Permit Status: Expired
Permit Number: T18FC00373
Permite Description: Automatic Fire Extingshing Sys - BLDG #3 - INSTALL NEW FIRE SPRINKLER SYSTEM; Commercial Fire Sprinkler Systems - Standpipe New Outlets: 4
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
05/14/2019 COT - FCON - Sprinkler - Final N/A Partial Pass {Activity date: 05/14/2019; Status: Partial Approval; Inspector: JPEELDAVIS; Comment: Entered by JPEELDA1 - Tested the fire pump. The fire pump passed the inspection, however, the signals could not be verifyed to the fire alarm system so the fire pump is locked out until the signals can be confirmed.
Need to verify that the fire pump, water flow and tamper signals are reportting off site prior to approving a TCO for fixturing of the building.}
04/16/2019 FCON – OH Piping & Hydro N/A Partial Pass {Activity date: 04/16/2019; Status: Partial Approval; Inspector: CBASALDUA; Comment: Entered by CBASALD1 - Hydro test for Standpipes.} ; {Activity date: 09/20/2018; Status: Approved; Inspector: gsereno1; Comment: Entered by GSERENO1 - 2nd and 3rd floor only and parking garage} ; {Activity date: 09/13/2018; Status: Partial Approval; Inspector: JPEELDAVIS; Comment: Entered by JPEELDA1 - 245 PSI Parking garage 1st floor, 230 PSI Parking garage 2nd floor, 250 PSI Parking garage 3rd floor. 1st Floor Bldg 1 upright coverage added 205 PSI for hydro} ; {Activity date: 09/05/2018; Status: Partial Approval; Inspector: JPEELDAVIS; Comment: Entered by JPEELDA1 - 201 PSI Bldg 3 1st floor, 204 PSI Bldg 3 2nd floor, 205 PSI Bldg 3 3rd floor, 207 PSI Bldg 3 4th floor. Need to either add upright coverage to 1st-3rd floors and or make sure that the insulation is within 2" of the deck. 4th and 2nd floor far north bathrooms were missing heads}

Documents

File Name Document Type  
None DOCUMENTS VIEW
HYDRALIC CALS.PDF DOCUMENTS VIEW
HYDRALIC CALCS PT2.PDF DOCUMENTS VIEW
001_FP-1.TIF FIRE PLANS VIEW
002_FP-2.TIF FIRE PLANS VIEW
003_FP-3.TIF FIRE PLANS VIEW
004_FP-4.TIF FIRE PLANS VIEW
005_FP-5.TIF FIRE PLANS VIEW
006_FP-6.TIF FIRE PLANS VIEW
007_FP-7.TIF FIRE PLANS VIEW
008_FP-8.TIF FIRE PLANS VIEW
009_FP-9.TIF FIRE PLANS VIEW
010_FP-10.TIF FIRE PLANS VIEW
011_FP-11.TIF FIRE PLANS VIEW
012_FP-12.TIF FIRE PLANS VIEW
013_FP-13.TIF FIRE PLANS VIEW
014_FP-14.TIF FIRE PLANS VIEW
015_FP-15.TIF FIRE PLANS VIEW
016_FP-16.TIF FIRE PLANS VIEW
017_FP-17.TIF FIRE PLANS VIEW
018_FP-18.TIF FIRE PLANS VIEW
019_FP-19.TIF FIRE PLANS VIEW
020_FP-20.TIF FIRE PLANS VIEW