Inspection Status: Partial Pass
Inspection History: FCON – OH Piping & Hydro
| Date |
Description |
Inspector |
Results |
Comments |
| 04/16/2019 |
FCON – OH Piping & Hydro |
CBASALDUA |
Partial Approval |
Entered by CBASALD1 - Hydro test for Standpipes. |
| 09/20/2018 |
FCON – OH Piping & Hydro |
gsereno1 |
Approved |
Entered by GSERENO1 - 2nd and 3rd floor only and parking garage |
| 09/13/2018 |
FCON – OH Piping & Hydro |
JPEELDAVIS |
Partial Approval |
Entered by JPEELDA1 - 245 PSI Parking garage 1st floor, 230 PSI Parking garage 2nd floor, 250 PSI Parking garage 3rd floor. 1st Floor Bldg 1 upright coverage added 205 PSI for hydro |
| 09/05/2018 |
FCON – OH Piping & Hydro |
JPEELDAVIS |
Partial Approval |
Entered by JPEELDA1 - 201 PSI Bldg 3 1st floor, 204 PSI Bldg 3 2nd floor, 205 PSI Bldg 3 3rd floor, 207 PSI Bldg 3 4th floor. Need to either add upright coverage to 1st-3rd floors and or make sure that the insulation is within 2" of the deck. 4th and 2nd floor far north bathrooms were missing heads |