Inspection History Details
Inspection Status: Partial Pass
Inspection History: FCON – OH Piping & Hydro
Permit Number - T18FC00373
Inspection Description - FCON – OH Piping & Hydro
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/16/2019 | FCON – OH Piping & Hydro | CBASALDUA | Partial Approval | Entered by CBASALD1 - Hydro test for Standpipes. |
09/20/2018 | FCON – OH Piping & Hydro | gsereno1 | Approved | Entered by GSERENO1 - 2nd and 3rd floor only and parking garage |
09/13/2018 | FCON – OH Piping & Hydro | JPEELDAVIS | Partial Approval | Entered by JPEELDA1 - 245 PSI Parking garage 1st floor, 230 PSI Parking garage 2nd floor, 250 PSI Parking garage 3rd floor. 1st Floor Bldg 1 upright coverage added 205 PSI for hydro |
09/05/2018 | FCON – OH Piping & Hydro | JPEELDAVIS | Partial Approval | Entered by JPEELDA1 - 201 PSI Bldg 3 1st floor, 204 PSI Bldg 3 2nd floor, 205 PSI Bldg 3 3rd floor, 207 PSI Bldg 3 4th floor. Need to either add upright coverage to 1st-3rd floors and or make sure that the insulation is within 2" of the deck. 4th and 2nd floor far north bathrooms were missing heads |