Permit Details

Status:
Expired
Type:
Fire Construction Permit
Apply Date:
04/30/2018
Applicant:
Description:
Automatic Fire Extingshing Sys - BLDG #1 - INSTALL NEW FIRE SPRINKLER SYSTEM; Commercial Fire Sprinkler Systems - Standpipe New Outlets: 8; Commercial Fire Pumps and Related Equipment - New Pumps: 1; Additional Inspections: 6

Outstanding Inspections

Permit Status: Expired
Permit Number: T18FC00366
Permite Description: Automatic Fire Extingshing Sys - BLDG #1 - INSTALL NEW FIRE SPRINKLER SYSTEM; Commercial Fire Sprinkler Systems - Standpipe New Outlets: 8; Commercial Fire Pumps and Related Equipment - New Pumps: 1; Additional Inspections: 6
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
05/14/2019 COT - FCON - Sprinkler - Final N/A Partial Pass {Activity date: 05/14/2019; Status: Partial Approval; Inspector: JPEELDAVIS; Comment: Entered by JPEELDA1 - Tested the fire pump. The fire pump passed the inspection, however, the signals could not be verifyed to the fire alarm system so the fire pump is locked out until the signals can be confirmed.
Need to verify that the fire pump, water flow and tamper signals are reportting off site prior to approving a TCO for fixturing of the building.}
04/16/2019 FCON – OH Piping & Hydro N/A Partial Pass {Activity date: 11/21/2018; Status: Partial Approval; Inspector: CBASALDUA; Comment: Entered by CBASALD1 - Bldg 1, Level 1. Rooms 1101-1108.} ; {Activity date: 04/16/2019; Status: Partial Approval; Inspector: CBASALDUA; Comment: Entered by CBASALD1 - Hydro test for Standpipes.} ; {Activity date: 03/01/2019; Status: Partial Approval; Inspector: jvincent; Comment: Entered by MROSS2 - PA approval (OH/pressure test) on 1st and 2nd floor study hall/amenities. Reinspection fees added to this permit for partial inspections.} ; {Activity date: 01/25/2019; Status: Cancelled; Inspector: gsereno1; Comment: Entered by GSERENO1 - Said scheduled appointment with another inspector for Weds Jan 30, 2019} ; {Activity date: 01/16/2019; Status: Partial Approval; Inspector: CBASALDUA; Comment: Entered by CBASALD1 - OH/pressure test approved for Level 4 Rooms 1401-1408}

Documents

File Name Document Type  
None DOCUMENTS VIEW
HYDRALIC CALS.PDF DOCUMENTS VIEW
HYDRALIC CALCS PT2.PDF DOCUMENTS VIEW
001_FP-1.TIF FIRE PLANS VIEW
002_FP-2.TIF FIRE PLANS VIEW
003_FP-3.TIF FIRE PLANS VIEW
004_FP-4.TIF FIRE PLANS VIEW
005_FP-5.TIF FIRE PLANS VIEW
006_FP-6.TIF FIRE PLANS VIEW
007_FP-7.TIF FIRE PLANS VIEW
008_FP-8.TIF FIRE PLANS VIEW
009_FP-9.TIF FIRE PLANS VIEW
010_FP-10.TIF FIRE PLANS VIEW
011_FP-11.TIF FIRE PLANS VIEW
012_FP-12.TIF FIRE PLANS VIEW
013_FP-13.TIF FIRE PLANS VIEW
014_FP-14.TIF FIRE PLANS VIEW
015_FP-15.TIF FIRE PLANS VIEW
016_FP-16.TIF FIRE PLANS VIEW
017_FP-17.TIF FIRE PLANS VIEW
018_FP-18.TIF FIRE PLANS VIEW
019_FP-19.TIF FIRE PLANS VIEW
020_FP-20.TIF FIRE PLANS VIEW