Permit Details

Status:
Expired
Type:
COMMERCIAL OTHER
Apply Date:
12/19/2018
Applicant:
METRO TUCSON EXPEDITING & DEVELOPMENT
Description:
STRUCTURAL UPGRADES
Contractors:
  • SUN STATE CONTRACTING LLC

Permit Reviews

Permit Number - T18CM09871
Permit Status: Expired
Permit Description: STRUCTURAL UPGRADES
Start Date Submittal Complete Date Status  
12/19/2018 COMMERCIAL - BLDG/FIRE/ZONING/ENG 12/24/2018 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T18CM09871
Permit Status: Expired
Permit Description: STRUCTURAL UPGRADES
Total Outstanding Activity Conditions - 6
Date Name
12/19/2018 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
12/19/2018 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
12/19/2018 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
12/19/2018 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
12/19/2018 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
12/19/2018 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.

Outstanding Inspections

Permit Status: Expired
Permit Number: T18CM09871
Permite Description: STRUCTURAL UPGRADES
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
BUILDING ABOVE CEILING N/A Not Inspected
BUILDING - FINAL N/A Not Inspected
04/29/2019 FRAMING N/A Correction Required AN OPENING HAS BEEN CUT IN THE ROOF DIAFRAM FOR THE PURPOSE OF HOISTING I-BEAMS INTO PLACE. I WAS TOLD THIS WAS A TEMPORARY OPENING, HOWEVER IT APPEARS IN EVERY WAY TO BE INTENDED AS A PERMANENT CLEAR STORY WINDOW OR SKYLITE. THE CONTRACTOR WAS REMINDED THAT THEIR PERMIT WAS ISSUED FOR STRUCTURAL REPAIRS WITHIN THE EXISTING STRUCTURE ONLY, NO WORK ON THE EXTERIOR OF THE BUILDING IS COVERED UNDER THE EXISITING PERMIT, AND THE EXISTING APPROVED PLAN DOES NOT SHOW THE ROOF PENETRATION OR THE SKYLITE STRUCTURE.
11/27/2019 BUILDING - PROGRESS N/A Partial Approval Basement footing for elevator.

Ok to pour.

Completed Inspections

Permit Status: Expired
Permit Number: T18CM09871
Permit Description: STRUCTURAL UPGRADES
Total Completed Inspections - 2
Date Description Inspector Results Comments
01/28/2019 BUILDING PRE-SLAB ESTEVENS Approved
01/28/2019 EXCAVATION/LAYOUT REBAR & ZON ESTEVENS Approved

Documents

File Name Document Type  
001_G1.TIF CONSTRPLANS VIEW
002_S0.1.TIF CONSTRPLANS VIEW
003_S1.1.TIF CONSTRPLANS VIEW
004_S1.2.TIF CONSTRPLANS VIEW
005_S2.1.TIF CONSTRPLANS VIEW
006_S3.1.TIF CONSTRPLANS VIEW
007_S3.2.TIF CONSTRPLANS VIEW
008_S4.1.TIF CONSTRPLANS VIEW
009_S4.2.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW