Inspection Status: Correction Required
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 04/29/2019 |
FRAMING |
|
Correction Required |
AN OPENING HAS BEEN CUT IN THE ROOF DIAFRAM FOR THE PURPOSE OF HOISTING I-BEAMS INTO PLACE. I WAS TOLD THIS WAS A TEMPORARY OPENING, HOWEVER IT APPEARS IN EVERY WAY TO BE INTENDED AS A PERMANENT CLEAR STORY WINDOW OR SKYLITE. THE CONTRACTOR WAS REMINDED THAT THEIR PERMIT WAS ISSUED FOR STRUCTURAL REPAIRS WITHIN THE EXISTING STRUCTURE ONLY, NO WORK ON THE EXTERIOR OF THE BUILDING IS COVERED UNDER THE EXISITING PERMIT, AND THE EXISTING APPROVED PLAN DOES NOT SHOW THE ROOF PENETRATION OR THE SKYLITE STRUCTURE. |
| 03/20/2019 |
FRAMING |
|
Partial Approval |
2nd floor joist. |