Permit: T18CM07935
Permit Details
Apply Date:
10/05/2018
Applicant:
PIMA VENTURES LLC
Description:
REMODEL INTERIOR, NEW ELECTRIC SERVICE, NEW HEAT PUMP & DUCTWORK, NEW PLUMBING, AND NEW WINDOWS
Contractors:
- PIMA VENTURES LLC
Permit Reviews
Permit Number - T18CM07935
Permit Status: Final
Permit Description: REMODEL INTERIOR, NEW ELECTRIC SERVICE, NEW HEAT PUMP & DUCTWORK, NEW PLUMBING, AND NEW WINDOWS
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/05/2018 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 10/05/2018 | COMPLETED |
| 10/18/2018 | REVISION - - 1ST | 10/18/2018 | ACTIVE |
Outstanding Activity Conditions
Permit Number - T18CM07935
Permit Status: Final
Permit Description: REMODEL INTERIOR, NEW ELECTRIC SERVICE, NEW HEAT PUMP & DUCTWORK, NEW PLUMBING, AND NEW WINDOWS
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/05/2018 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T18CM07935
Permit Description: REMODEL INTERIOR, NEW ELECTRIC SERVICE, NEW HEAT PUMP & DUCTWORK, NEW PLUMBING, AND NEW WINDOWS
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/05/2018 | EXCAVATION/LAYOUT REBAR & ZON | DMCCARTHY | Approved | customer canceled early this morning |
| 12/12/2018 | ELECTRIC - SERVICE UPGRADE | DMCCARTHY | Approved | service entrance cable has already connected power powered up Met foreman Outfront after inspection explain to him everything is not ready he doesn’t need a carbon copy and said that they should not have even called the inspections today and they’re not ready yet he’s gonna look into electrical Service upgrade details |
| 12/12/2018 | PLUMBING - ROUGH, SOIL | DMCCARTHY | Approved | work is not ready for test |
| 12/20/2018 | MECHANICAL - INTERMEDIATE | TVALENCIA | Approved | 1- Shall provide (3) sided blocking on all forced air vents. Inspection stop! |
| 12/20/2018 | PLUMBING - INTERMEDIATE | TVALENCIA | Approved | 1- Shallprovide a directional fitting for the tub waste line. 2- Fernco couplings are not approved within the structure, shall provide mission specialty couplings. 3- Shall provide a directional fitting for the laundry waste line. 4- Shall provide cast iron perm. caps for all dead end drains under the slab. 5- Threaded fittings not allowed in a concealed location at lavatory waste line. 6- 2 inch waste line can not be reduced to 11/2 inch existing waste line in wall. 7- Clothes washer stand pipe distance is 18 inches minimum and 42 inches maximum. 8- Shall provide a minimum of 18 inches if copper piping then tranation to pex at the water heater supplies. 9- Shall provide a directional fitting for the water closet and install in a conventional manner. 10- Shall provide tracer wire on bldg. Sewer. 11- Horizontal branch vent for the front bathroom lavatory shall be located a minimum of 6 inches above the flood level rim of the fixture. 12- Front bathroom tub requires a trap and vent. 13- Kitchen sink horizontal vent shall be located 6 inches above the flood level rim of the fixture. |
| 12/20/2018 | ELECTRIC - FINAL | TVALENCIA | Approved | 1- Conductors and box devises in walls are okay |
| 12/20/2018 | BUILDING PRE-SLAB | DQUINN | Approved | 1- Footing is missing steel reinforcement. |
| 01/29/2019 | PLUMBING - GAS PRESSURE TEST | JBURGE | Approved | Gauge set at 10 psi. |
| 02/12/2019 | FRAMING | TVALENCIA | Approved | |
| 02/12/2019 | ROOF NAILING | TVALENCIA | Approved | |
| 02/12/2019 | EXT METAL CLIPS/EXT SHEATHING | TVALENCIA | Approved | |
| 04/04/2019 | GAS CLEARANCE | TVALENCIA | Approved | |
| 04/04/2019 | MECHANICAL - FINAL | TVALENCIA | Approved | |
| 04/04/2019 | PLUMBING - FINAL | TVALENCIA | Approved | |
| 04/04/2019 | BUILDING - FINAL | TVALENCIA | Approved |