Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Expired
Type:
Commercial Building
Apply Date:
09/21/2018
Applicant:
Lisa Bowers
Description:
TI: MULTI PURPOSE BUILDING

Permit Reviews

Permit Number - T18CM07533
Permit Status: Expired
Permit Description: TI: MULTI PURPOSE BUILDING
Start Date Submittal Complete Date Status  
09/21/2018 PLANS OK TO SUBMIT - COMM 10/02/2018 COMPLETED Review Details
10/02/2018 3RD PARTY REVIEW - COMMERCIAL TI 12/14/2018 COMPLETED Review Details
12/14/2018 POST 3RD PARTY REVIEW 12/21/2018 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T18CM07533
Permit Status: Expired
Permit Description: TI: MULTI PURPOSE BUILDING
Total Outstanding Activity Conditions - 10
Date Name
09/21/2018 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
12/14/2018 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
12/14/2018 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
12/14/2018 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
12/14/2018 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
12/14/2018 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
12/14/2018 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
12/14/2018 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
12/14/2018 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/14/2018 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.

Outstanding Inspections

Permit Status: Expired
Permit Number: T18CM07533
Permite Description: TI: MULTI PURPOSE BUILDING
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
05/03/2019 COT - LCBU - Building Above Ceiling N/A Canceled {Activity date: 05/03/2019; Status: Not Applicable; Inspector: RCAMACHO; Comment: Entered by CBELL1 - } ; {Activity date: 01/25/2019; Status: Cancelled; Inspector: BSTEVENS; Comment: Entered by CBELL1 - This inspection was called under the wrong permit.}
05/03/2019 COT - LCBU - Stem Wall/Retaining Wall N/A Canceled {Activity date: 05/03/2019; Status: Not Applicable; Inspector: RCAMACHO; Comment: Entered by CBELL1 - } ; {Activity date: 04/10/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - Slab on grade and interstitial floor at canopy only}
05/07/2019 COT - LCME - Mechanical Above Ceiling N/A Canceled {Activity date: 05/07/2019; Status: Not Applicable; Inspector: RCAMACHO; Comment: Entered by CBELL1 - }
05/07/2019 COT - LCBU - Exterior Clips/Sheathing N/A Canceled {Activity date: 05/07/2019; Status: Not Applicable; Inspector: RCAMACHO; Comment: Entered by CBELL1 - }
05/07/2019 COT - LCEL - Electrical Above Ceiling N/A Canceled {Activity date: 05/07/2019; Status: Not Applicable; Inspector: RCAMACHO; Comment: Entered by CBELL1 - }
05/07/2019 COT - LCBU - Roof Nailing N/A Canceled {Activity date: 05/07/2019; Status: Not Applicable; Inspector: RCAMACHO; Comment: Entered by CBELL1 - }
07/24/2019 COT - LCME - Mechanical Final N/A Canceled {Activity date: 07/24/2019; Status: Not Applicable; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - }
07/24/2019 COT - LCME - Mechanical Intermediate N/A Canceled {Activity date: 07/24/2019; Status: Not Applicable; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - }

Completed Inspections

Permit Status: Expired
Permit Number: T18CM07533
Permit Description: TI: MULTI PURPOSE BUILDING
Total Completed Inspections - 16
Date Description Inspector Results Comments
01/09/2019 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 01/09/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by CBELL1 - } ; {Activity date: 01/08/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - After hours APA account $165.00
F6.5 Footer
See highlighted plan S1.1D} ; {Activity date: 01/08/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - F6 footer
F8-B footer
F- 7.5 footer
see highlighted S1.1D plan} ; {Activity date: 01/05/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - After hours APA account $165.00
2-F6 footers & 2-F8B footers west 4 footings of canopy with column grounding. See highlighted S1.1D plan} ; {Activity date: 01/07/2019; Status: Not ready for Inspection; Inspector: RCAMACHO; Comment: Entered by CBELL1 - No work rain} ; {Activity date: 01/04/2019; Status: Not ready for Inspection; Inspector: RCAMACHO; Comment: Entered by CBELL1 - work not complete} ; {Activity date: 01/02/2019; Status: Not ready for Inspection; Inspector: RCAMACHO; Comment: Entered by CBELL1 - no work} ; {Activity date: 12/31/2018; Status: Cancelled; Inspector: BSTEVENS; Comment: Entered by CBELL1 - Canceled by contractor} ; {Activity date: 12/28/2018; Status: Not ready for Inspection; Inspector: RCAMACHO; Comment: Entered by CBELL1 - no work} ; {Activity date: 12/27/2018; Status: Not ready for Inspection; Inspector: RCAMACHO; Comment: Entered by CBELL1 - No work}
04/11/2019 COT - LCBU - Preslab Passed {Activity date: 04/11/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by CBELL1 - } ; {Activity date: 04/10/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - Slab on grade and interstitial floor at canopy only}
04/15/2019 COT - LCEL - Electrical Underground Passed {Activity date: 04/15/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by CBELL1 - } ; {Activity date: 01/09/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - Except Welds at columns} ; {Activity date: 01/08/2019; Status: Not ready for Inspection; Inspector: RCAMACHO; Comment: Entered by CBELL1 - no work} ; {Activity date: 01/05/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - After hours APA account $165.00
2-F6 footers & 2-F8B footers west 4 footings of canopy with column grounding. See highlighted S1.1D plan} ; {Activity date: 01/07/2019; Status: Not ready for Inspection; Inspector: RCAMACHO; Comment: Entered by CBELL1 - No work rain} ; {Activity date: 01/04/2019; Status: Not ready for Inspection; Inspector: RCAMACHO; Comment: Entered by CBELL1 - work not complete} ; {Activity date: 12/28/2018; Status: Not ready for Inspection; Inspector: RCAMACHO; Comment: Entered by CBELL1 - no work} ; {Activity date: 12/27/2018; Status: Not ready for Inspection; Inspector: RCAMACHO; Comment: Entered by CBELL1 - No work}
05/07/2019 COT - LCEL - Electrical Intermediate Passed {Activity date: 05/07/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by CBELL1 - } ; {Activity date: 04/15/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - Welds at column grounding only}
05/07/2019 COT - LCBU - Framing Passed {Activity date: 05/07/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by CBELL1 - }
05/07/2019 TRSP - ROW - Final/Close-Out Passed {Activity date: 05/07/2019; Status: Approved; Inspector: Bravin; Comment: Entered by MBRAVIN1 - No right of way work needed}
07/24/2019 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 07/24/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }
07/24/2019 COT - LCEL - Outdoor Lighting Passed {Activity date: 07/24/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - }
07/24/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 07/24/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 05/03/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by CBELL1 - Not ready on site for inspection}
07/24/2019 COT - LCEL - Electrical Final Passed {Activity date: 07/24/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - }
07/24/2019 ENGR Engineering Final Passed {Activity date: 07/24/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }
07/24/2019 PDSD Building Division - Sign Final Passed {Activity date: 07/24/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 05/03/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by CBELL1 - Not ready on site for inspection}
09/03/2019 COT - FCON - Sprinkler - Final Passed {Activity date: 09/03/2019; Status: Approved; Inspector: JPEELDAVIS; Comment: Entered by JPEELDA1 - Fire sprinklers were not required per BCO/FCO.} ; {Activity date: 05/07/2019; Status: Denied; Inspector: JPEELDAVIS; Comment: Entered by JPEELDA1 - Need to add fire sprinklers to the awning. Drawings show sprinkler increase also Chief of Raytheon wants the "awning" sprinklered due to combustible storage}
09/10/2019 COT - LCBU - Building Final Passed {Activity date: 09/10/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } ; {Activity date: 07/24/2019; Status: Partial Approval; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - pending fire corrections}
10/22/2019 COT - FCON - Alarm - Final Passed {Activity date: 10/22/2019; Status: Approved; Inspector: JPEELDAVIS; Comment: Entered by JPEELDA1 - } ; {Activity date: 09/10/2019; Status: Partial Approval; Inspector: JPEELDAVIS; Comment: Entered by JPEELDA1 - Tested the fire alarm devices for the outside patio. Need to have asbuilt drawings submitted for this added area} ; {Activity date: 05/07/2019; Status: Denied; Inspector: JPEELDAVIS; Comment: Entered by JPEELDA1 - Need to install weatherproof fire alarm notification devices on the three levels of the "awning/patio". Permit required for this work.}
10/22/2019 COT - FCON - Fire - Final Passed {Activity date: 10/22/2019; Status: Approved; Inspector: JPEELDAVIS; Comment: Entered by JPEELDA1 - } ; {Activity date: 09/03/2019; Status: Partial Approval; Inspector: JPEELDAVIS; Comment: Entered by JPEELDA1 - Approved for Occupancy just need to get the final fire alarm plans so that we can close out the permits.}