Permit: T18CM06715
Permit Details
Apply Date:
08/24/2018
Applicant:
DUARTE KRISTEN L AND KRISTEN
Description:
FIRE DAMAGE REPAIR (T18DV05082 - MENDOZA)
Contractors:
- UPRIGHT ENERGY L L C
Permit Reviews
Permit Number - T18CM06715
Permit Status: Final
Permit Description: FIRE DAMAGE REPAIR (T18DV05082 - MENDOZA)
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/24/2018 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 08/24/2018 | COMPLETED |
12/03/2018 | REVISION - - 1ST | 12/17/2018 | ACTIVE |
Outstanding Activity Conditions
Permit Number - T18CM06715
Permit Status: Final
Permit Description: FIRE DAMAGE REPAIR (T18DV05082 - MENDOZA)
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
08/24/2018 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T18CM06715
Permit Description: FIRE DAMAGE REPAIR (T18DV05082 - MENDOZA)
Total Completed Inspections - 11
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/27/2018 | ELECTRIC - FINAL | MHASSAN | Approved | |
08/28/2018 | ELECTRIC - RECONNECT | BJONES1 | Approved | IVRS - Inspection :NO WIRING TO SHOP THAT WAS AREA OF FIRE. SMOKE DETECTORS IN ALL SLEEPING ROOMS AS WELL AS LIVING AND DINING ROOM. NO FIRE REPORT AVAILABLE FROM FIRE DEPT. OR INSURANCE CARRIER. PANEL BREAKERS OK, NO POWER TO ANY SOURCES DAMAGED. ALL SWITCH PLATES INSTALLED. TEP NOTIFIED FOR RECN |
12/27/2018 | RESIDENTIAL INTERMEDIATE | DQUINN | Approved | 1. Roof ok to dry in. 2. Elec almost complete and ok. 3. Gas at 7.5 lbs for 2 weeks. Check again 4. Wall sheathing ok to mesh. 5. Fire stop penetrations and drop soffits. 6. New ducts ok. Need vent fans in place. |
01/07/2019 | PLUMBING - GAS PRESSURE TEST | B Jones | Approved | |
02/06/2019 | GAS CLEARANCE | DQUINN | Approved | |
02/25/2019 | BUILDING - FINAL | RCHANDLER | Approved | |
02/25/2019 | FRAMING | RCHANDLER | Approved | |
02/25/2019 | ROOF NAILING | RCHANDLER | Approved | |
02/25/2019 | EXT METAL CLIPS/EXT SHEATHING | RCHANDLER | Approved | |
02/25/2019 | EXCAVATION/LAYOUT REBAR & ZON | RCHANDLER | Approved | |
02/25/2019 | PLUMBING - FINAL | RCHANDLER | Approved |