Permit: T18CM06686
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3180 W CAMINO DEL SAGUARO
Address NEW:
3180 W CAMINO DEL SAGUARO
Apply Date:
08/24/2018
Applicant:
Karen Bellamy
Description:
SFR INTERIOR REMODEL & PATIO
Outstanding Inspections
Permit Status: Complete
Permit Number: T18CM06686
Permite Description: SFR INTERIOR REMODEL & PATIO
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/07/2022 | COT - LCBU - Framing | N/A | Canceled | Inspection Canceled |
Completed Inspections
Permit Status: Complete
Permit Number: T18CM06686
Permit Description: SFR INTERIOR REMODEL & PATIO
Total Completed Inspections - 14
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/08/2019 | COT - RSPL - Rough Soil | Passed | {Activity date: 03/08/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by CBELL1 - } ; {Activity date: 03/06/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by CBELL1 - 1- Shall provide directional fittings for the lavatory and water closet in hallway. 2- Shall provide a vent for the master shower waste line. 3- Shall provide a minimum of two times the pipe size for the trap arm to the clothes washer. 4- Shall provide minimum of 18 inches of stand pipe for the clothes washer. 5- Shall provide a vent for the exterior sink. 6- Shall provide a water test on the entire sanitary system up to the top of vents thru roof.} |
|
| 04/21/2020 | COT - BULD - SWG Clearance | Passed | {Activity date: 04/21/2020; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - CODE} | |
| 04/21/2020 | COT - RSPL - Gas Pressure Test | Passed | {Activity date: 04/21/2020; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - RVI Southwest gas clearance is required} | |
| 06/19/2020 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 06/19/2020; Status: Approved; Inspector: TVALENCIA; Comment: Entered by RSALDAT1 - approved} ; {Activity date: 10/17/2019; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by DMERANZ1 - SE radius footing ok to pour. } |
|
| 06/19/2020 | COT - RSBU - Masonry Pregrout | Passed | {Activity date: 06/19/2020; Status: Approved; Inspector: TVALENCIA; Comment: Entered by RSALDAT1 - approved} ; {Activity date: 06/02/2020; Status: Partial Approval; Inspector: TVALENIA; Comment: Entered by RSALDAT1 - partial 1- Okay to grout the first lift and second lift up to lintel only. } ; {Activity date: 05/14/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Grout. Partial. 2nd column lift, 5 feet to 10 feet.} ; {Activity date: 05/12/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Porch pillar on southeast corner on home. 1st lift to 5’.} |
|
| 12/03/2020 | COT - RSBU - Roof Nailing | Passed | {Activity date: 12/03/2020; Status: Approved; Inspector: ESTEVENS; Comment: Entered by PAHUMAD1 - } ; {Activity date: 11/25/2020; Status: Not ready for Inspection; Inspector: DQUINN; Comment: Entered by PAHUMAD1 - There was no message left with contact #, to perform a virtual inspection. The contact # on the permit, is an architect who said she has never heard of this job. Recall this inspection and leave a message with a contact #, to perform a virtual inspection.} |
|
| 12/03/2020 | RSME - Mechanical Progress | Passed | {Activity date: 12/03/2020; Status: Approved; Inspector: ESTEVENS; Comment: Entered by PAHUMAD1 - Approved by TVALENCIA on 05/03/2019.} | |
| 11/05/2021 | COT - RSME - Mechanical Final | Passed | {Activity date: 11/05/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by RSALDAT1 - Ap} | |
| 02/16/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 02/16/2024 | COT - RSBU - Preslab | Passed | ||
| 02/16/2024 | COT - RSBU - Stem Wall/Retaining Wall | Passed | ||
| 02/16/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 02/16/2024 | COT - RSEL - Electrical Final | Passed | ||
| 02/16/2024 | RSBU - Building Final | Passed | Corrections were made. 2/16/2024 |